Laserfiche WebLink
Pmpowl for <br />construct the improvements. Plan sheets will consist <br />of a title sheet, a general notes sheet, typical sections <br />sheets, roadway plan and profile sheets at a scale of <br />1"=20', enlarged curb ramp plans at a scale of 1"=5', <br />and general civil details sheets. <br />Signing and Striping Design <br />Tetra Tech will prepare signing and striping PS&E's for <br />the adjustments in vehicle travel lane widths through <br />the corridor and to provide high visibility marked <br />crosswalks at the intersections. Plans will be prepared <br />at a scale of 1"=40' with double stacked plan views <br />along with detail sheets as necessary. The PS&E will <br />be prepared by a CA Licensed Civil Engineer for the <br />approval by the City's Traffic Section. All work will <br />be designed in compliance with the CA MUTCD, City <br />Standards, and Caltrans Standards. <br />Utility Relocations/Modifications <br />Tetra Tech will prepare utility relocation and <br />modification PS&E at a scale of 1"=20' with <br />double stacked plan views along with detail sheets <br />as necessary. This scope will be shown on the <br />WQMP plans described below. Scope is assumed <br />to include minor adjustments to grade of existing <br />valve boxes and manhole lids, adjustments and/ <br />or minor relocations of existing pull boxes, and the <br />reconstruction of parkway drains and catch basin <br />openings. Other existing features, such as fire <br />hydrants and light poles, will be protected in place. <br />Below grade utilities will be protected in place. <br />WQMP Design <br />Tetra Tech will prepare WQMP BMP PS&E at a scale <br />of 1"-20' with double stacked plan views along with <br />detail sheets as necessary. The plans will include all <br />necessary construction information to construct the <br />selected BMPs from the WQMP described under Task <br />4.0 below. <br />Traffic Signal Modifications <br />Our subconsultant, The Alliance Group Consulting <br />(TAGC) will prepare PS&Es for the modification of <br />the existing traffic signals located along First St. <br />between Flower St. and Standard Ave. The traffic <br />signal modifications are assumed to only consist of <br />pedestrian push button relocations and adjustments <br />of traffic signal loops to account for the sidewalk <br />widening, curb ramp reconstruction, and travel lane <br />adjustments. The scope of work does not include <br />any other signal modifications, new utility services, <br />or equipment upgrades at the existing intersections. <br />The modifications are anticipated to occur at the <br />intersections of First St. and the following streets: <br />Flower St., Ross St., Broadway, Sycamore St., Main <br />St., Bush St./Cypress Ave., Shopping Center Entrance, <br />and Standard Ave. Additional intersections are not <br />included in the scope of work. Construction plans <br />will consist of redlined as-builts for each existing <br />intersection. As-builts are to be provided by the City. <br />TAGC will also prepare PS&Es for the installation of <br />a new signalized intersection at First Street and Lacy <br />Street. Additional intersections are not inlcuded <br />in the scope of work. Scope of work includes the <br />coordination with Southern California Edison (SCE) <br />and the City contract to establish a new service for <br />the new signalized intersection. <br />The traffic signal modification plans will be prepared <br />at 1"=20' scale and will be designed in conformance <br />with CA MUTCD and City requirements. One sheet will <br />be prepared per intersection. All design plans will be <br />stamped and signed by a CA Licensed Civil Engineer. <br />It is assumed that signal timing sheets will be handled <br />by City staff. <br />Specifications <br />Tetra Tech will prepare complete contract <br />specifications based on City of Santa Ana Special <br />Provision, the Standard Specifications for Public <br />Works Construction (Green book 2012), and the <br />latest Caltrans Standard Specifications (Currently <br />2018). A list of contract pay items with descriptions <br />and estimated quantities will be included in the front <br />of the special provisions in the bid schedule, and a <br />definition of bid items defining each pay item in this <br />schedule will be provided. The Special provisions <br />will be prepared in Microsoft Word, and the City <br />will provide the boilerplate special provisions to the <br />Consultant. Tetra Tech will identify any recommended <br />changes to these special provisions that may be <br />relevant to the success of this project. It is expected <br />that within the Boilerplate specifications, a Definition <br />of Bid Items in addition to the Bid Proposal Schedule <br />will be provided. <br />Cost Estimate <br />Tetra Tech will prepare quantity calculations and <br />cost estimates for all items that are applicable to this <br />project. Quantities for all contract pay items will be <br />substantiated by calculations and provided in a neat <br />and orderly fashion showing all sketches, diagrams, <br />and dimensions necessary to allow them to be used <br />CITY OF SANTA ANA 2 V K134 <br />