Dan Helt <br />FIRST STREET PEDESTRIAN IMPROVEMENTS PS&E <br />RFP NO.: 10-110 <br />(PESR) that included all necessary analyses and a recommendation for <br />regional stormwater capture treatment and implementation. The analysis <br />identifies the existing site hydrology, water quality, and hydraulics to <br />determine an optimal combination of the inflow rate, storage volume, and <br />outflow. The project consists of a gravity diversion from two separate Los <br />Angeles County Flood Control District storm drain lines; a 72" RCP line that <br />drains 261 acres of the Los Cerritos Channel, and a 38' wide rectangular <br />concrete channel that drains 2,995 acres of the Lower San Gabriel River. <br />Camp Roberts Perimeter Road, California Army National Guard, San <br />Miguel, CA. Mr. Helt was responsible for overseeing topographic survey <br />services for upgrades to approximately 17.1 miles of roadway alongthe <br />East and West Perimeter Range Roads at Camp Roberts. The goal of the <br />project update existing roadways up to modern asphalt standards, provide <br />a safe, reliable and usable environment for soldier training and improve <br />operability and maintainability of roadways. The topographic survey <br />was performed using both traditional ground and mobile LiDAR survey <br />techniques. <br />Templeton to Atascadero Connector, County of San Luis Obispo, <br />Templeton, CA. Mr. Helt was responsible for overseeing topographic <br />and right-of-way survey services, and for coordinating with Union Pacific <br />Railroad (UPRR) for survey site access. Tetra Tech designed a multi- <br />use pathway. The project involved extensive permiting, environmental <br />reviews, right-of-way acquisition, construction documents and grant <br />administration. The pathway network provided connectivity between <br />Templeton and Atascadero, facilitating safe and attractive transportation <br />between these two towns and encouraging alternative transportation <br />modes. <br />Elmer Avenue Phase II Project, City of Los Angeles, Bureau of <br />Engineering, Sun Valley, CA. As Project Engineer and surveyor, Mr. Helt <br />was responsible for field reconnaissance and design of this Proposition <br />"O" project. The Phase II project improvements consisted of two <br />additional catch basins and hydrodynamic separators, and the regrading <br />of an intersection. Through the incorporation of additional Low Impact <br />Development infrastructure, the project increased infiltration capacity; <br />recharged to the groundwater supply; reduced polluted stormwater runoff <br />and improved public safety. Athorough site investigation, topographic <br />survey, and hydraulic calculations were performed for the entire Elmer <br />Avenue watershed area. Tetra Tech worked closely with the Bureau of <br />Engineering (BOE), the Watershed Council, and community residents <br />through design workshops to create a final design within a very aggressive <br />schedule and within budget. The final design included two new catch <br />basins and storm drain piping that collects and conveys additional <br />stormwater to the infiltration galleries. Hydrodynamic separators were <br />installed at each end of Elmer Avenue. These separators will collect and <br />prevent sediment from entering the infiltration galleries. A pavement <br />overlay was provided at the intersection of Stagg Street and FairAvenue to <br />direct additional flow to the galleries. Tetra Tech also provided bid support <br />and As -bid documents. <br />EDUCATION <br />BS, Civil Engineering, California <br />Polytechnic University, <br />San Luis Obispo, 2003 <br />REGISTRATIONS/ <br />CERTIFICATIONS <br />Professional Engineer, California, <br />No. C69347, 2006 <br />Professional Land Surveyor, <br />California, No. 8925, 2012 <br />RESUMES 2rYK48 <br />