Laserfiche WebLink
AA 2018-09 <br />December 9, 2019 <br />Page 2 <br />The Church also owns the adjacent office building located at 1100-B North Tustin. This site <br />contains a 13,300 square foot, two-story office building that is leased to non -church tenants such <br />as medical office uses. This building is currently not planned to be converted to Church related <br />uses. <br />Vehicular access to the site Is currently provided from two existing driveways on Fruit Street and <br />three existing driveways on Wellington Avenue. As the project consists of the removal and <br />reconstruction of building on the existing campus, access to the project will not be altered. <br />Table 1: Prolect and Location Information <br />Project Address 1010 and 1100-B North Tustin Avenue <br />Nearest Intersection Tustin and Wellington Avenues <br />General Plan Designation Professional and Administrative Office (PAO) <br />Zoning Designation Professional (P) <br />Surrounding Land Uses <br />North <br />Professional Office <br />East <br />ProfesslonalOffice/Hospital <br />South <br />Professional Office <br />West <br />Single -Family Residential <br />Property Size <br />10.8 acres <br />Existing Site Development <br />The site is currently developed as the church campus for Calvary Church <br />and a professional office building <br />Applicable Zoning Code Sections <br />SAMC Chapter 41, Article III, Division 26 (Specific Development) <br />Project Description <br />The applicant is requesting approval of an amendment application (zone change) to allow a variety <br />of uses to operate on the site as well as to allow for future redevelopment of the Calvary Church <br />campus. More specifically, the applicant is requesting that several uses not allowed in the <br />Professional zoning district, including religious/educational uses, be permitted on the site and to allow <br />a modification of development standards to tailored to the Calvary Church site. If approved, the <br />applicant intends to implement the Calvary Church Master Plan, which includes the demolition of four <br />buildings, the partial demolition of a fifth building, and the construction of three new buildings. At the <br />completion of the master plan build out, the size of the campus will increase by 46,840 square feet, <br />bringing the total square footage of.the campus to 404,341 square feet. <br />The buildings to be demolished include a 7,500 square foot classroom building (Building B), an 8,800 <br />square foot office building (Building D), a 3,600 square foot classroom building (Building F), and a <br />7,900 square foot fellowship hall (Building 1). Additionally, approximately 6,000 square feet will be <br />removed from the existing Chapel building (Building Q. In their place will be a now three-story, <br />29,000 square foot Children's Ministry Center (New Building B), a three-story, 32,000 square foot <br />Student Life Center (New Building D), and a two-story, 19,000 square foot Community Life Center <br />(New Building D). <br />75B-26 <br />