My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - ROOF IMPROVEMENTS AT SA TRANSPORTATION CENTER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
02/18/2020
>
23A - ROOF IMPROVEMENTS AT SA TRANSPORTATION CENTER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:00:17 PM
Creation date
2/13/2020 4:06:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
2/18/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Award Contract to C.I <br />February 18, 2020 <br />Page 2 <br />Services, Inc. for Roof Improvements at SARTC <br />Public Outreach and Contractor Participation <br />To provide an opportunity for local vendors to submit bids to repair the roof, a Notice Inviting Bids <br />was advertised in the Orange County Register newspaper on August 9 and 16, 2019, and bids <br />were received electronically via the City's web -based electronic bidding system, PlanetBids, on <br />September 26, 2019. Through the PlanetBids online portal, vendors may register to receive <br />notifications on all current and future City projects, as well as download contract documents, <br />receive project updates and submit bids electronically. <br />A total of 71 vendors, including six located in the City of Santa Ana, were notified of the project via <br />PlanetBids. Thirty-four vendors requested bidding documents and four bids were received, with <br />none from Santa Ana contractors. <br />Bid Results Summary <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BASE BID <br />1 <br />C.I. Services, Inc. <br />Mission Viejo <br />$997,647 <br />2 <br />Best Contracting Services, Inc. <br />Gardena <br />$1,254,100 <br />3 <br />A Good Roofer, Inc. <br />Lakeside <br />$1,473,753 <br />4 <br />Chapman Coast Roof, Inc. <br />Fullerton <br />$1,521,066 <br />C.I. Services, Inc. submitted the lowest responsive bid in the amount of $997,647 (Exhibit 2). <br />Based on the bid analysis and a contractor's reference check, staff recommends awarding the <br />construction contract to C.I. Services, Inc. (Exhibit 3). <br />Protect Delivery <br />In addition to the construction contract awarded to the lowest responsive bidder, the estimated total <br />cost of the project includes construction administration, inspection, and testing, along with an <br />allowance for contingencies to account for unexpected or unforeseen conditions. Construction <br />administration and inspection include construction management; implementation of the City's <br />Community Workforce Agreement requirements; inspection of the Contractor's work to ensure <br />contract compliance, workmanship, and quality; and material testing. As indicated in the Cost <br />Analysis (Exhibit 4) and as summarized in the table below, the total estimated construction delivery <br />cost of the project is $1,247,060. <br />Construction Contract <br />$997,647 <br />Construction Administration, Inspection, and Testing <br />$149,648 <br />Contingencies <br />$99,765 <br />ESTIMATED CONSTRUCTION DELIVERY COST <br />$1,247,060 <br />These amounts will cover all staffing costs for delivery of this capital project and no additional <br />funding will be used. <br />23A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.