My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT FOR ON-CALL CONSTRUCTION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
25F - AGMT FOR ON-CALL CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 1:50:46 PM
Creation date
4/16/2020 12:52:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
©allaceASSuciate5 CITY OF CORONA <br />DEPARTMENT <br />OF WATER & POWER <br />consulting, inc. <br />e <br />Construction Management Services for Keith 1220-Zone Potable Water Tank <br />LABOR HOURS <br />Labor Hours and Rates <br />Resident TOTAL <br />Scope of Work Tasks <br />Project Manager Construction Manager Engineer/inspection Office Engineer HOURS <br />Task 2 - FIELD INSPECTION <br />Provide continuous inspection of the Work of the Contractorat the site when being performed. PrIreview <br />inspection of Work at off -site locations when required to ensure compliance with Construction Con <br />Task 2-A <br />100 0 400 <br />requirements. Observe the work of the Contractor for compliance with the Contract Documents an0 <br />testing and inspection reports. <br />Perform and assist in performing the daily duties of construction quality assurance inspection andincluding: <br />excavation, compaction, subgrade inspection, backfill, base, paving, structures inspecti <br />inspection, welding inspection, drainage system inspection, underground utility construction inspection, quantity <br />Task 2-B <br />0 1 100 0 214 <br />calculations, checking grade and alignment, monitoring construction site cleanliness, observing materials <br />sampling and testing, and ensuring that all work is in compliance with project plans and specifications and per <br />federal, state and local requirements. <br />Task 2-C Prepare daily activities reports. <br />0101VSO 0 90 <br />Task 2-D Attend construction progress meetings as required. <br />80 16 0 96 <br />Task 2-E <br />Maintain an awareness of safety and health requirements and enforce applicable regulations and contract <br />0 <br />0 <br />2 <br />2 <br />previsions for the protection of the public and project personnel. <br />Task 2-F <br />Prepare calculations, records, reports, and correspondence related to project activities and progress pay <br />80 <br />12 <br />0 <br />92 <br />estimates. <br />Task 2-G <br />Review the Contractor's as -built drawings on a weekly basis to verify they are being updated as construction <br />40 <br />8 <br />0 <br />48 <br />progresses. <br />Task 2-H Analyze the Project Plans and Specifications for possible errors and deficiencies and report such findings to the <br />16 <br />12 <br />0 <br />28 <br />Construction Manager. _ <br />_ <br />Observe the performance of a variety of field quality control tests such as relative compaction, concrete slump <br />tests, concrete cylinders, and other required field-tests. The City will employ and pay for the services of <br />independent third -party testing laboratories and inspectors not included in the scope of worlsfor this RF <br />Task 2-I <br />0 <br />40 <br />12 <br />0 <br />52 <br />Consultant's inspectors shall observe and report on the performance of all tests and speci -' spections. <br />performed by independent third -party testing laboratories and inspectors to ensure complia with the <br />Construction Contract requirements (federal, state and local) requirements. <br />Task 2J Observe setup and implementation of traffic control measures and ensure comp ffi <br />0 <br />40 <br />0 <br />0 <br />40 <br />control plans and the California MUTCD. <br />0 <br />24 <br />8 <br />0 <br />32 <br />Task 2-K Observe installation and testing of electrical, instrumentation, and control systems. <br />Assist the Construction Manager with quantity measurement and c lotions for p#gress pa timates, <br />documentation of Contractor work performance and project eventseeping recortls of extra performance, <br />Task 2-L <br />0 <br />88 <br />8 <br />0 <br />96 <br />implementation of minorchanges in the work, implementation of revisions to the plans and specifications, and <br />development of estimates for contract change orders. Review extra work invoices. <br />Assist in preparing Force Account extra work reports and potential claim reports and be available to attend and <br />Task 2-M <br />0 <br />12 <br />8 <br />0 <br />20 <br />support any change order and claim settlements meetings. <br />10 <br />112 <br />0 <br />10 <br />12 <br />Task 2-N Assist in review of Contractor's schedule update data and status reports. <br />e <br />©al lace&Associates 25F-228 <br />consulting, inn. City of Santa Ana I Water Resources Construction Managementand Inspection Services No.19-118 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.