Laserfiche WebLink
©allaceAssociates <br />consulting, Inc. <br />CITY OF CORONA <br />DEPARTMENT OF WATER & POWER <br />Construction Management Services for Keith 1220-Zone Potable Water Tank <br />LABOR HOURS <br />sk 2 - FIELD INSPECTION (cont.) <br />Task 2-0 Report promptly to the Construction Manager and notify the Contractor of safety violations observed during the <br />inspection of Work. <br />Provide a report by telephone or text to the City Project Manager or Public Works management any incident on <br />Task 2-P or near the project, or related to the project activities, involving a response by emergency personnel, altercation <br />or dispute with members of the public, or regulatory actions taken by an authorized government agent. <br />Task 2-Q Maintain continuous 24-hour telephone accessibility during construction activity for emergency use. <br />Task 2-R Fill out incident (accident) reports within 72 hours of an incident or accident. <br />Task 2-S Take and promptly store photographs of the Project on daily basis. <br />Task 2-T Prepare checklists and schedule of critical startup and commissioning items. <br />Coordinate instrumentation and control system integration and startup with the City, the City's system integrator <br />Task 2-0 Contractor, electrical sub -contractor, and design engineer to facilitate a successful startup and commissioning <br />effort. <br />Task 2-V Assist in the preparation of "As -Built" plans and other record documents. <br />Task 2-W Assist in the preparation of a punch list of incomplete or unsatisfactory items for the Contractor to complete a,d <br />participate in final inspections. <br />Task 2-X Normal working hours are between 7:00 a.m. and 5:00 p.m. with a lunch break, subject to minor adjustments <br />based on contractor's schedule. <br />Task 2-Y Perform other related duties as required. <br />Task 2-Z Maintain continuous communication with the Construction Manager and other field personnel and staff <br />ub-Totih Ta <br />0 I I 8 0 8 <br />0 <br />0 <br />0 <br />0 <br />8 <br />8 <br />0 <br />8 <br />0 <br />32 <br />0 <br />4 <br />8 <br />0 <br />32 <br />24 <br />8 <br />0 <br />32 <br />24 <br />8 <br />0 <br />32 <br />06 <br />1 <br />0 <br />24 <br />8 <br />400 <br />0 <br />32 <br />0 <br />1006 <br />0 <br />0 <br />0 <br />1406 <br />e <br />©al lace&Associates 25F-229 <br />consulting, in,. <br />City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 <br />27 <br />