My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH- RESO ONE BROADWAY PLAZA
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
75A - PH- RESO ONE BROADWAY PLAZA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 3:36:00 PM
Creation date
4/16/2020 3:28:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
465
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GPA No. 2020-01 & ZOA No. 2020-02 — One Broadway Plaza <br />March 30, 2020 <br />Page 6 <br />Zoning Ordinance Amendment <br />The 2004 approvals for the One Broadway Plaza did not contemplate high-rise residential <br />development as part of the project. Due to shifting economic trends, combined with the need for <br />additional housing, have resulted in the applicant requesting approval of a zoning ordinance <br />amendment to the One Broadway Specific Development District (SD-75) to allow residential uses <br />in addition to office and commercial related uses. <br />A series of site -specific objectives, policies and development standards have previously been <br />approved to guide the development of the tower and associated parking structure, including <br />development standards pertaining to FAR, the parking garage, project amenities, and public art. <br />The SD has also been framed to allow the construction of the project to prohibit future modifications <br />to enlarge or reduce the size of the project and maintain the scale and character established by <br />the existing structures and streetscape pattern of the Midtown area. <br />New standards are proposed that are directly related to the proposed residential use of the project, <br />including unit size, interior finishes, and parking. Approval of the proposed amendments to the <br />SD-75 will allow for the creation of a new City landmark through the construction of a mixed -use <br />building with the height, scale and quality to serve as a central focal point of the Downtown area. <br />Additionally, the proposal would allow for Class A office space in a configuration suitable for major <br />tenants in the immediate vicinity of the Civic Center area of the City. Finally, the demand for <br />amenities, such as restaurants, public gathering areas and entertainment activities, would create <br />additional employment and revitalization opportunities in the central City. <br />California Environmental Quality Act (CEQA) <br />The proposed development required preparation of studies relating to air quality and greenhouse, <br />noise and traffic. The purpose of the studies was to evaluate the changes of the proposed revisions <br />as compared to the existing entitlements to see if any new or modified mitigation was required. The <br />studies were submitted by the applicant and were reviewed for content and accuracy by the City. <br />The technical studies concluded that an EIR Addendum to the previously certified 2004 EIR is the <br />appropriate CEQA document to evaluate and disclose the project's impacts. <br />An addendum to a previously certified EIR is prepared when a lead agency is asked to approve <br />modifications to an existing project for which an EIR has already been certified. An addendum <br />evaluates the requested modifications and determines whether subsequent EIR review is required. <br />Pursuant to CEQA case law, an addendum applies the same thresholds as the original, certified <br />EIR. Moreover, pursuant to Public Resources Code section 21166 and State CEQA Guidelines <br />section 15162, when an EIR has been certified for a project, the City shall not require a subsequent <br />or supplemental EIR or negative declaration for the project unless the lead agency determines that <br />one or more of the following conditions are met: <br />1. Substantial project changes proposed that would result in new or substantially more severe <br />impacts than disclosed in the previous EIR; <br />75A-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.