My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PUBLIC HEARING 5 YR CONSOLITATED PLAN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
05/05/2020
>
75A - PUBLIC HEARING 5 YR CONSOLITATED PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2020 3:25:38 PM
Creation date
4/30/2020 3:09:10 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75A
Date
5/5/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
605
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Of those who participated in the community outreach survey, 87% indicated that they had access to <br />broadband internet. <br />Santa Ana complies with HUD's Narrowing the Digital Divide Through Installation of Broadband <br />Infrastructure in HUD -Funded New Construction and Substantial Rehabilitation of Multifamily Rental <br />Housing (81 FR 92626) rule (effective January 19, 2017). Through this rule, all new HUD -funded multi- <br />family construction or substantial rehabilitation has included broadband infrastructure including cables, <br />fiber optics, wiring and wireless connectivity to ensure that each unit has the infrastructure to achieve at <br />least 25 mbps download and 3 mbps upload speeds. <br />Describe the need for increased competition by having more than one broadband Internet <br />service provider serve the jurisdiction. <br />Throughout the city, residents are serviced by two, oftentimes at least three internet service providers <br />who offer high speed internet. The three primary service providers in Santa Ana are Spectrum, ATT and <br />Earthlink. <br />While broadband is available through multiple providers, residents who participated in the community <br />outreach survey, identified that access to broadband was the highest public infrastructure need in Santa <br />Ana. <br />Consolidated Plan SANTA ANA 111 <br />OMB control No: 2506-0117(exp. 06/30/2018) 75A-119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.