internal surfaces, furnishing and installing new structural steel pipe supports, coating removal, <br />surface preparation, replacing structural roof supports, repair and replacement of the reservoir <br />vents, installation of roof handrails, replacement of stainless steel access ladders, SCAQMD <br />compliance during sandblasting, and atmospheric monitoring during surface preparation. <br />• Steel Tank Inspection for the City of Corona - Potable Water Steel Tank Inspection for the <br />City of Corona (2011) — Project included the inspection/assessment of seven (7) steel potable <br />water tanks ranging in storage volumes of 0.064 MG to 2.0 MG. Inspection included assessment <br />of each respective tanks coating and general site condition and safety and providing <br />recommendations for repairs and determining regularly scheduled maintenance program items. <br />• City of San Clemente, El Levante 1.3 MG Pre -Stressed Concrete Reservoir — Provide Utility <br />Management and Inspection Services for the Replacement of the City of San Clemente's <br />Reservoir No. 3. <br />• Reservoir No 8 Interior Coating and Improvements for the City of San Clemente - Utility <br />management and project supervision for the upgrade of a 2 MG welded steel potable water <br />reservoir interior coating and structural improvements. <br />• Watermain Improvements at Mariposa Avenue for the City of El Segundo - Field Engineer <br />for the Project which required the installation of 6, 8, 10 and 12-inch Ductile Iron Pipe and <br />appurtenances associated with the replacement of an existing Water Distribution System. Work <br />included project daily documentation of work, performed, conformance with the Contract <br />Document's of installation and removal of water distribution system infrastructure, reviewing <br />submittals, materials and disinfection and testing of the distribution system. <br />• Northrop Grumman Recycled Water Lateral for West Basin Municipal Water District — <br />Construction Manager/Inspector responsible forthe project which required installation of a 6-inch <br />recycled water service between two existing 6-inch recycled water pipeline systems. Work <br />included furnishing all materials, labor, equipment, fuel, tools, transportation, and services for <br />construction, testing, and completion of the project. Work also included mobilization and <br />demobilization, utility potholing, installation of recycled water service lateral, valves, hydrostatic <br />testing as well as trench repair pavement. The project required permits from the City of Redondo <br />Beach and the City of Manhattan Beach as the project boundaries were on the boarder of the two <br />Cities. <br />• Butterfield Chino Creek 10 inch Forcemain Relocation Project for the City of Chino Hills — <br />Construction Manager/Resident Engineer for the relocation of a 10 inch DI wastewater forcemain <br />that included approximately 500 LF of 10 DR 14 C-900 PVC, 100 ft Jack and Bore 24 inch welded <br />steel casing to cross Chino Creek. <br />• Well 9 Discharge Pipeline on Gardenia Avenue and Bushard Street for the City of Fountain <br />Valley - Construction Inspector for the project which involved 2,800 LF of 16-inch cement mortar <br />lined and coated welded steel pipe, appurtenant valves, combination air and vacuum release <br />valves, blow -offs and the connections to the existing distribution system in the center of a high <br />traffic intersection in the City of Fountain Valley (Bushard Street and Warner Avenue). The work <br />also included a crossing of the Ocean View Channel, and repaving of the three (3) southbound <br />lanes of Bushard and pavement rehabilitation of Gardena Avenue <br />• Watermain Improvements at Center, Walnut, and Maple for the City of El Segundo — <br />Construction Manager for the project which consisted of approximately 3,500 LF of 10" DIP, 850 <br />LF of 8" DIP, 1,000 feet of a temporary high -line system to serve customers while replacements <br />were being conducted on Center Street, appurtenant valves, new fire hydrants, fire hydrant <br />abandonments; 8 connections to existing system; re-establishment of water services; installation <br />of new service meters; hydrostatic testing of new water main; chlorination and de -chlorination of <br />AKM Prop. 20-1004 Appendix B - 9 <br />