AKM CONSULTING ENGINEERS
Clerk
>
Contracts / Agreements
>
A
>
AKM CONSULTING ENGINEERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 4:10:34 PM
Creation date
5/6/2020 4:16:23 PM
Metadata
Fields
Template:
Contracts
Company Name
AKM CONSULTING ENGINEERS
Contract #
A-2020-076-06
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
9/20/2025
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
water main; and final flushing. Also included was rehabilitation of concrete paving, cross gutters, <br />curb/gutter/sidewalks, and a grind and cap of the streets along the pipe alignment. <br />• Watermain Improvements at Virginia, Oak, and Bayonne for the City of EI Segundo — Senior <br />Inspector for the project which consisted of approximately 4,000 LF of 8" DIP, appurtenant valves, <br />new fire hydrants, fire hydrant abandonments; 108 connections to existing system; re- <br />establishment of water services; installation of new service meters; hydrostatic testing of new <br />water main; chlorination and de -chlorination of water main; and final flushing. Also included was <br />rehabilitation of concrete paving, cross gutters, curb/gutter/sidewalks, and slurry seal. <br />• Watermain and Street Improvements at Center Street and Pine Avenue for the City of El <br />Segundo — Senior Inspector for the project which consisted of the construction of 1,500 linear <br />feet of 10-inch ductile iron watermain pipe; 50 linear feet of 6-inch ductile iron watermain; <br />appurtenant valves; fire hydrant abandonments; ten (10) connections to the existing system; <br />reestablishment of water services; hydrostatic testing of the new watermain; chlorination and then <br />subsequent de -chlorination of the new watermain and final flushing. The project also included <br />rehabilitation of asphalt concrete paving within the limits of the watermain alignment; <br />reconstruction of an existing concrete cross gutter; reconstruction of curb, gutter and sidewalk <br />improvements; slurry seal of Center Street and Pine Avenue within the limits of construction and <br />traffic striping. Project challenges included the establishment of one way traffic control and a <br />detour around the work area which was within several hundred feet of two (2) schools. <br />• Marblehead Coastal Tract Improvements (Sewer, Water, Storm Drain and Street) for the <br />City of San Clemente - Utility Management and project supervision for the development and <br />construction of the City of San Clemente's Marblehead Coastal Commercial and Residential <br />Tract. The project included 8-inch VCP, PVC and HDPE sanitary sewer improvements, as well <br />as street improvements including construction of new asphalt concrete roads, curb, gutter and <br />sidewalk improvements. <br />• Pipelines 3, 4 & 5 Relocation at the 1-15 Freeway Widening for San Diego County Water <br />Authority— Resident Engineer of the replacement and relocation of segments of 66-inch, 78-inch <br />and 96-inch cement mortar lined and coated welded steel transmission mains. <br />• Relocation of 27 inch CML&C Water Transmission Pipeline for the City of San Clemente — <br />Utility management and project supervision for the relocation of 5,200 If of 27-inch steel <br />transmission pipeline. Responsibilities included review all construction submittals, RFI's, change <br />orders and progress schedule documents; ensuring conformance of all phases of project <br />construction and job site safety; providing project coordination/communication between all joint <br />powers and utility owners. <br />• 16 inch-CML&C Water Pipeline on Gardenia and Bushard Street for the City of Fountain <br />Valley - Construction Management/Resident Engineer: The Project involved 2,800 LF of Cement <br />Mortar Lined and Coated Welded Steel Pipe, Appurtenant Valves, Combination Air and Vacuum <br />Release Valves, Blow -Offs and the Connections to the Existing Distribution System in the center <br />of a high traffic intersection in the City of Fountain Valley (Bushard and Warner). <br />• Lift Station No. 7 for the City of Alhambra — Construction Manager for the project consisting of <br />the replacement of the existing capacity deficient and old sewage lift station with a new duplex <br />slide rail submersible pump station with 750 gpm pumps. The project includes 200 feet of 8-inch <br />to 12-inch diameter gravity sewers, jack and bore crossing of the 1-10 Freeway, 4,000 LF of 10- <br />inch force main, standby generator, extensive bypass operations, and coordination with Caltrans <br />and Metrolink. <br />• Del Avion Wastewater Wet Well Rehabilitation for Moulton Niguel Water District - <br />Construction Manager and Resident Engineer for the project which involved structural concrete <br />AKM Prop. 20-1004 Appendix B - 10 <br />