My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AKM CONSULTING ENGINEERS
Clerk
>
Contracts / Agreements
>
A
>
AKM CONSULTING ENGINEERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 4:10:34 PM
Creation date
5/6/2020 4:16:23 PM
Metadata
Fields
Template:
Contracts
Company Name
AKM CONSULTING ENGINEERS
Contract #
A-2020-076-06
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
9/20/2025
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
repairs and preparation and placement of an epoxy coating surface to provide structural integrity <br />to all exposed concrete surfaces within the wet well. <br />Sewer Lift Station No 3 Project for the City of Alhambra — Construction Manager responsible <br />for providing complete management of the new submersible duplex sewer lift station which will <br />replace an existing 90-year old wet well -dry well lift station located under a freeway on -ramp. The <br />work consisted of utility relocations, 500 LF of new 8-inch gravity sewer, 50 LF of new 6-inch <br />ductile iron forcemain, a new sliderail submersible pump station, utility relocations, and demolition <br />of the existing pump station (pending). The pump station included a 25-foot deep, 7-foot diameter <br />wet well with (2) 15 HP, 350 gpm sliderail submersible pumps, a valve vault with by-pass <br />connection and flow meter, and an 80 kW emergency generator. The work required extensive <br />coordination with Caltrans. <br />Paseo Del Mar Sewer Pump Station for the City of Palos Verdes Estates — Construction <br />Manager and Resident Inspector for the project which involved replacement of a duplex wet well <br />sewer lift station. The project included a new 35' deep x 8' diameter T-lock lined wet well, a precast <br />concrete mechanical valve vault, construction of a 5-foot diameter T-lock lined manhole, <br />conversion of the existing 30-foot deep 4-inch diameter wet well and existing 34-foot deep 11- <br />inch diameter dry well to emergency storage structures including the application of an <br />epoxy/polyurethane lining for both structures, new electrical system and control panels, new <br />pumps, new motors and variable frequency drives (VFDs) as well as a new PLC and integration <br />with the Los Angeles County Department of Public Works' (LACDPW) who maintains and <br />operates the facility, existing SCADA system. Startup testing and training activities were <br />coordinated between City staff, the Contractor and LACDPW. <br />Rocky Point Sewer Pump Station for the City of Palos Verdes Estates —Lead Construction <br />Inspector for upgrading of a sewage pump station which included utility relocations in preparation <br />for the work, construction of a new T-lock lined underground reinforced concrete emergency <br />storage wet well with epoxy/polyurethane lined floor, construction of two new T-lock lined precast <br />concrete manholes, bypass sewage pumping while the existing pump station was taken out of <br />service, recoating of the existing wet well with an epoxy/polyurethane coating, new D.I. forcemain <br />piping, gravity sewers, a new MCC, a new PLC, integration of the PLC with the Los Angeles <br />County Department of Public Works (LACDPW), who maintains and operates the facility, as well <br />as coordination and review of testing, startup and training activities with the City, Contractor and <br />LACDPW. <br />• Partridge Lift Station and Thunderbird Sewer Project for the Garden Grove Sanitary District <br />— Lead Inspector for the construction of a duplex wet well sewer lift station and 700 LF of 8-inch <br />PVC gravity pipe, 400 LF of 4" PVC sewer forcemain pipe, a T-Lock lined 25' deep x 8' diameter <br />precast concrete wet well, precast concrete mechanical valve vault, a new MCC and new PLC. <br />The project also involved repaving of Partridge Street and the streets within the Thunderbird <br />Mobile Home Park as well as conducting startup testing of the completed facility. <br />• Tiffany Pump Station for the Garden Grove Sanitary District — Inspector for the project <br />consisting of replacement of the existing wet well dry well facility with a new submersible pump <br />station, including a large T-lock lined wet well for emergency storage of sewage, and an <br />emergency generator. The project also involved the installation of a new forcemain, connection <br />to the existing forcemain, new manholes and gravity sewer lines, the construction of an odor <br />control system, and a bypass pumping system. In order to construct the new cast -in -place wet <br />well, a dewatering system was installed and ground settlement program monitoring program was <br />implemented. <br />• Sewer Rehabilitation at Various Locations Project for the City of Cypress — Construction <br />Inspector for the project involving the replacement of approximately 2,700 LF of VCP gravity <br />AKM Prop. 20-1004 Appendix B - 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.