Laserfiche WebLink
sewer line ranging from 8-inch to 12-inch in size. The project also involves the installation of 378 <br />LF of folded and re-formed lining, in -line pressure grouting, injection grouting of manholes, <br />epoxy/polyurethane lining of four (4) manholes and construction of 1 new manhole. Additionally <br />required is installation of a sewer bypass system during the work, dewatering and settlement <br />monitoring, traffic control, asphalt concrete paving repair of the trenched areas including re - <br />striping, and pre and post installation closed circuit television (CCTV) inspection of the sewer lines <br />to be replaced or repaired. <br />• Sewer Spot Repairs for the City of Alhambra — Construction Manager/Inspector for the City's <br />sewer spot repair of 8-inch to 10-inch VCP, and replacement of one sewer manhole. Work <br />included traffic control, bypass pumping, asphalt paving, trench repair and appurtenant curb & <br />gutter replacement. <br />• Sewer System Repair, Relining, and Replacement Project for City of El Segundo (EPA <br />FUNDED) — Construction manager/inspector for the replacement of 6,300 LF of 8-inch, 10-inch, <br />and 12-inch VCP and relining of 1,500 LF of 8-inch VCP. The project, which was located in <br />residential streets, also involved traffic control, bypass pumping at multiple locations and repaving <br />of the streets. <br />Imperial Headgates and Weir Pond Project for Orange County Water District — Field <br />Inspector - AKM provided construction management and field engineering for the Imperial <br />Headgates and Weir Pond Rehabilitation Project. The project included the following: supply and <br />installation of a new trash rack and monorail gripper system for river debris removal; removal and <br />replacement of electrical conduits and panels inside the Control Building; removal and <br />replacement of Control Building and Generator Building roofs, access hatches, and ventilation <br />fans; replacement of three (3) 54-inch square cast-iron slide gates and five (5) electrical actuators; <br />installation of two Doppler flow meters in the Bypass Conduits; integration of new signals from <br />cleaning system and flow meters to existing SCADA system; construction of concrete retaining <br />walls and slab in support of new monorail and gripper trash racks cleaning system; demolition of <br />existing flume structure, Weir No. 1 and drain pipe slide gate and structure, and existing Weir No. <br />2 and drain pipe slide gate and structure; construction of new flume structure and related pressure <br />transducer system, new Weir No. 1 with new drain slide gate and structure, new sharp crested <br />Weir No. 2 with new drain slide gate and structure, and related pressure transducer system; <br />regrading of existing Weir Ponds 1 and 2; and testing, training and startup. Additional work <br />includes the construction of approximately 1,600 feet of 8" HDPE gravity pipeline with <br />appurtenances. <br />AKM Prop. 20-1004 Appendix B - 12 <br />