My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC-A-2020-075-05
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC-A-2020-075-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 9:24:10 AM
Creation date
5/6/2020 4:19:23 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-075-05
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2021
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OLD GRAND STREET AND SANTA <br />CLARA AVENUE SEWER MAIN <br />IMPROVEMENTS <br />CITY OF SANTA ANA I SANTA ANA, CA <br />Our team is currently providing engineering design <br />services for the Old Grand Street, Santa Clara <br />Avenue and Wright Street Sewer Main improvements. <br />The project consists of replacing approximately <br />5,900 LF of existing sewer pipe, related laterals and <br />manholes. Existing sewer main pipes include 3,000 <br />LF of 15-inch and 2,900 LF of 12-inch sewer main. <br />Existing sewer laterals will be replaced to the edge <br />of the right-of-way to each property line. Services <br />include preparation of plans, specifications and cost <br />estimates, topographic survey, manhole details and <br />utility research/investigation. <br />DATES: MARCH 2O19-CURRENT <br />KEY PERSONNEL: CHARLIE MCKINLEY. DAVID MAHER. <br />KHA 13-',EI- NHAN LY <br />CONTACT ARMANDO FERNANDEZ. PE. SENIOR CIVIL ENGINEER. <br />714- 47.3316. AFERNANDEZ@SANTA-AN.A.ORG <br />BRISTOL STREET WATER MAIN <br />IMPROVEMENTS <br />CITY OF SANTA ANA I SANTA ANA, CA <br />Our team provided engineering design services for <br />the Bristol Street Water Main Improvements project. <br />Services included preparation of plans, specifications <br />and cost estimates, including environmental support <br />services and geotechnical engineering services. <br />The project consisted of replacing approximately <br />2,600 LF of existing water main and water -related <br />appurtenances in South Bristol Street, between <br />Warner Avenue and St. Andrews Place. The existing <br />water main is located in the east (northbound) side of <br />the street in the right-hand slow lane. Existing water <br />services are to be extended to connect to the new <br />main after it has been tested and disinfected, while <br />the existing main will be abandoned in place. Existing <br />hydrants and other appurtenances will be replaced in <br />their current locations with approved facilities. <br />DATES: FEBRUARY 2019-APRIL 2019 <br />KEY PERSONNEL: CHARLIE MCKINLEY, DAVID MAHER, <br />KHANH NGUYEN, NHAN LY <br />CONTACT: ARMANDO FERNANDEZ. HE. SEMOR CIVIL ENGINEER. <br />714,647.3316. AFERNANDEZ@SANTA-ANA.ORG <br />
The URL can be used to link to this page
Your browser does not support the video tag.