My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC-A-2020-075-05
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC-A-2020-075-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 9:24:10 AM
Creation date
5/6/2020 4:19:23 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-075-05
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2021
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FLOWER STREET AND 17TH STREET <br />SEWER MAIN IMPROVEMENTS <br />CITY OF SANTA ANA I SANTA ANA, CA <br />Our team is currently providing engineering design <br />services for the Flower Street, 17th Street and <br />Greenleaf Street Sewer Main Improvements project. <br />The project consists of replacing approximately <br />4,500 LF of existing sewer pipe, related laterals and <br />manholes. Pipe diameters range from 8 inches to <br />15 inches. Existing sewer laterals will be replaced <br />to the edge of the right-of-way to each property line. <br />Services include preparation of plans, specifications <br />and cost estimates, topographic survey and utility <br />research/investigation. <br />DATES: MARCH 2O19-CURRENT <br />KEY PERSONNEL: CH.ARLIE NICKINLEY, DAVID MAHER. <br />KHANH NGUYEN. NHAN LY <br />CONTACT: ARMANDO FERN.ANDEZ. PE. SENIOR CIVIL ENGINEER, <br />714.647.3316. AFERNANDEZ@SANTA-ANA.ORG <br />NON -POTABLE WATER MAIN SYSTEM <br />CITY OF SANTA MONICA I SANTA MONICA, CA <br />NV5 is currently providing engineering design <br />services for the expansion of the city's non -potable <br />water main system at various locations citywide. The <br />system currently consists of more than 26,000 LF of <br />ductile iron pipe ranging in diameter from 4 inches to <br />12 inches. Our team is responsible for providing all <br />PS&E, including construction drawings, documents, <br />cost estimates, survey, utility research, construction <br />bidding support, traffic control plans, and construction <br />phase support services for this expansion. The project <br />is being broken up into two phases. Phase 1 consists <br />of the design of 1,400 LF of non -potable water <br />pipe on 5th Street from Santa Monica Boulevard to <br />Colorado Avenue. Phase 2 includes the connection <br />of the existing non -potable water main running along <br />Olympic Boulevard to the City Yards (2500 Michigan <br />Avenue). The connection supports the sustainability <br />goals of the City Yards Modernization Project. <br />DATES: APRIL 2019-CURRENT <br />KEY PERSONNEL: CHARLIE MCKINLEY, DAVID MAHER. NHAN LY <br />CONTACT: TOM SHAHBAZI, PROJECT MANAGER, <br />TOM.SHAHBAZI@SMGOV.NET. 310.458.8721, EXT. 2355 <br />
The URL can be used to link to this page
Your browser does not support the video tag.