My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC-A-2020-075-05
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC-A-2020-075-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 9:24:10 AM
Creation date
5/6/2020 4:19:23 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-075-05
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2021
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WALNUT STREET WATER MAIN <br />REPLACEMENT AND STREET REHAB <br />CITY OF LOMITA I LOMITA, CA <br />Our team provided engineering design services for <br />the Walnut Street Water Main Replacement and <br />Street Rehabilitation. The objective of the project is <br />to replace and upsize 1,800 LF of aging water main, <br />and to rehab Walnut Street within the water main <br />replacement project limit that includes design ofADA <br />curb ramps. The project was originally designed by <br />another firm and then revived several years later after <br />the City obtained the funds necessary to complete <br />construction. Services included reviewing and <br />revising the existing plans, specifications and cost <br />estimates. Design services included utility research, <br />constructability review, and obtaining the required <br />Caltrans encroachment permit for the water main <br />connection. <br />DATES: APRIL 2018-MAY 2019 <br />KEY PERSONNEL: CHARLIE MCKINLEY. DAVID MAHER, <br />V.ANESSA PAN ETO <br />CONTACT: MONDHER SATED. PE. PROJECT MANAGER. <br />M.S.AIED@LOMHTACITY.COiVJ. 310.325.7110. EXT. 110 <br />GRANDVIEW PUMP STATION <br />CITY OF GLENDALE DEPT. OF WATER & POWER I GLENDALE, CA <br />Our team is preparing plans, specifications and cost <br />estimates for the removal and replacement of the <br />existing Pump and Motor No. 2 with a new pump and <br />motor. Grandview Pump Station is more than <br />70 years old and pumps about 25% of the City's <br />water supply. The main goal of the project is to <br />increase the reliability and efficiency of the facility <br />by replacing the 72-year-old Pump No. 2, which <br />continues to experience failures. In addition, NV5 <br />is coordinating with the City's SCADA integrator to <br />assure all modifications during the design will be in <br />line with the City's control system. <br />DATES: SEPTEMBER 2018-CURRENT <br />KEY PERSONNEL: CHARLIE MCKINLEY. DAVID MAHER, <br />KHANH NGUYEN. NHAN LY <br />REFERENCE: RAJA TAKIDIN. PE. PROJECT MANAGER, <br />RTAKIDIN@GLENDALECA.GOV. 818.548.3906 <br />
The URL can be used to link to this page
Your browser does not support the video tag.