Laserfiche WebLink
rs� 4 <br />REVERSE OSMOSIS WATER <br />TREATMENT PLANT <br />CITY OF BEVERLY HILLS I BEVERLY HILLS, CA <br />NV5 is serving as the City's (Owner's) Representative <br />during the design -build of a pre-treatment system for <br />the City's existing Reverse Osmosis Water Treatment <br />Plant. Our team is overseeing the planning, design <br />and construction, as well as a period whereby the <br />plant will be commissioned, tested, permitted, and <br />City Operations Staff trained prior to project closeout. <br />The project, which is anticipated to last 18 months, <br />also includes evaluation and necessary upgrades <br />to the entire water supply system. NV5 is also <br />assisting the City with the preparation of all necessary <br />documentation and reports to obtain Division of <br />Drinking Water permits for the project. <br />DATES: OCTOBER 2018-CURRENT <br />KEY PERSONNEL: CHARLIE NICKINLEY, DAVID MAHER. JAMES <br />OWENS, KHANH NGUYEN. VANESSA PANETO, LUANNE SEAN <br />REFERENCE: VINCE DANIASSE. WATER RESOURCES MANAGER. <br />VDAMASSE@BEVERLYH!LLS.ORG. 310,285,2491 <br />UNION AVENUE SEWER LATERAL <br />REROUTING <br />CITY OF WHITTIER I WHITTIER, CA <br />Our team provided design engineering services <br />for the replacement of an existing 85-year-old <br />6-inch sewer main that runs in Union Avenue from <br />Philadelphia Street to Penn Street along Pierce <br />Avenue. The improvements relocated the sewer main <br />to a more accessible location due to its inaccessibility <br />because of development in the area. The project also <br />included the placement of manholes and upgrading <br />the mains from 6-inch to 8-inch PVC lines. Our team <br />provided final plans, specifications and estimates <br />(PS&E); utility location and coordination; research on <br />alternative replacement pipe methods; reconnecting <br />service laterals to the new system; guidance for <br />proper abandonment of existing pipes; details for <br />rehabilitating the street surface; and design of <br />reconstruction of existing manholes and/or reshaping <br />troughs. <br />DATES: APRIL 2016-OCTOBER 2017 <br />KEY PERSONNEL: KHANH NGUYEN. VANESSA PANETO <br />REFERENCE: KYLE CASON. ASSISTANT PUBLIC WORKS DIRECTOR. <br />KCASON@CITYOFW H ITTI ER.ORG. 562.567.9500 <br />