My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC-A-2020-075-05
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC-A-2020-075-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 9:24:10 AM
Creation date
5/6/2020 4:19:23 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-075-05
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2021
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACT INFO STEVEN GRANADOS, PE, QSD/QSP <br />steven.granados <br />@nv5.com Civil Design <br />EXPERIENCE Mr. Granados provides engineering assistance for a variety of water and <br />10 years wastewater projects including planning, engineering design, and preparation <br />EDUCATION of preliminary engineering reports for a variety of public and private clients. <br />B.S. Civil Engineering Previously he worked in the City of Stockton's public works department <br />where, as a part of the development services division, he performed plan - <br />LICENSES checks on subdivision maps and improvement plans submitted to the city. <br />Civil Engineer (CA) <br />No. 74823 Project Experience <br />Qualified SWPPP <br />Developer/Practitioner Unit AA Parallel Raw Water Pipeline <br />No. 24004 OLIVENHAIN MUNICIPAL WATER DISTRICT I ENCINITAS, CA <br />AVAILABILITY Project engineer for the design for the Olivenhain Municipal Water District's <br />AVAILABILITY <br />Unit AA Pipeline. The project consists of approximately 3 miles of 48-inch steel <br />water pipeline connecting the San Diego County Water Authority's aqueducts <br />to OMWD's treatment facility at the Olivenhain dam. The pipeline crosses <br />beneath Escondido Creek. Therefore, the pipeline was installed using jack and <br />bore techniques beneath the Creek. <br />San Vicente Wastewater Treatment Plant Improvements <br />RAMONA MUNICIPAL WATER DISTRICT I RAMONA, CA <br />Project engineer for final construction documents and construction services <br />to upgrade the headworks and two secondary clarifiers. The improvements <br />include replacing the existing screenings conveyance system at the headworks <br />with a washer/compactor unit to remove excess organics and water, including <br />a continuous bagger accessory to minimize contact and exposure to the <br />screenings. Upgrades to two of the existing secondary clarifiers include <br />replacing a suction type sludge removal mechanism in Clarifier No. 1 with a <br />scraper system to eliminate clogging, and installation of a skimmer and scum <br />baffle at the effluent weirs for both Clarifiers No. 1 and 2. <br />Ocotillo Water Pipeline Improvements <br />COYOTE VALLEY MUTUAL WATER COMPANY I IMPERIAL COUNTY, CA <br />Design engineer for the design of the replacement of a 50 year old storage <br />tank, addition of a second 100,000 gallon bolted steel tank and installation of a <br />5,000 LF potable water pipeline that connects two water companies in Imperial <br />County. Design challenges included the crossing of a floodplain, requiring <br />the concrete encasement of much of the pipeline, hydraulics to connect the <br />pipeline to both water companies, and approvals from multiple agencies. <br />Sand Canyon Pump Station <br />VENTURA COUNTY, CA <br />Project Engineer for the design of the expansion of a water booster station <br />from 800 gpm to 2,000 gpm. Improvements include expansion of pump station <br />building to house two horizontal split case pumps. Identified capital cost <br />savings by relocating existing generator and configuring controls to enable <br />continued use of generator. NV5 lead the design for the expansion of a water <br />booster station from 800 gpm to 2,000 gpm. Improvements include expansion <br />V 5 of pump station building to house two horizontal split case pumps. <br />
The URL can be used to link to this page
Your browser does not support the video tag.