Laserfiche WebLink
CONTACT INFO KHANH NGUYEN, EIT <br />khanh.nguyen@nv5.com n Civil Design <br />g <br />EXPERIENCE Mr. Nguyen has more than 17 years of project engineering and management <br />17 years experience in water, wastewater and civil engineering. As a staff engineer, his <br />EDUCATION work includes preparing construction design reports, engineering plans and <br />B.S. Civil Engineering specifications for water and recycled water pipelines design, street and storm <br />drain planning and design, grading and earthwork calculation using AutoCAD <br />LICENSES Civil 3D, reservoir rehabilitations, pump facilities, hydraulic analysis, and water <br />Civil Engineer -in -Training and wastewater facilities planning. <br />(CA) <br />AVAILABILITY Project Experience <br />80%.................................................................................................................................................................................... <br />PCH Water Main Replacement <br />CITY OF LOMITA I LOMITA, CA <br />Design Engineer. Mr. Nguyen designed/drafted plans and specifications for the <br />design of the PCH water main replacement project. This project consists of <br />replacing the existing dual 6-inch water mains and includes the installation of <br />fire hydrants, service laterals, valves, blow -offs, air release valves, and other <br />associated water appurtenances. <br />Palm Avenue Infrastructure Improvements <br />CITY OF WHITTIER I WHITTIER, CA <br />Design Engineer. Mr. Nguyen designed/drafted plans and specifications for <br />replacement of an existing 85-year-old 6-inch water main, 8-inch sewer main <br />with 8-inch SDR-35 sewer main and street reconstruction, along Palm Avenue <br />between Whittier Boulevard and Beverly Boulevard. This reach will replace <br />approximately 5,000 LF of pipeline and street pavement. <br />Corryne and Slauson Area Main Replacements and Abandonment <br />GOLDEN STATE WATER COMPANY I CULVER CITY, CA <br />Design Engineer. Mr. Nguyen designed/drafted plans for the replacing and <br />abandoning of 1,600 LF of undersized and old 4-inch, 6-inch, and 10-inch cast <br />iron water mains with 8-inch and 12-inch PVC in the public right of way (ROW). <br />The purpose of this project is to improve water quality, increase fire flows, <br />reduce maintenance costs, and improve system reliability. <br />Sewer System Rehabilitation Program Phase II and III <br />CITY OFANAHEIM I ANAHEIM,CA <br />Design Engineer. Mr. Nguyen designed/drafted plans for citywide sewer <br />improvements, a total of 44 sewer pipeline segments. The project included <br />spot repairs, lining of sewer segments and the removal and replacement <br />of sewer pipeline. Services included: preparing project studies and <br />recommendations; preparing plans, specifications and estimates; and <br />providing construction support. <br />Western Avenue Sewer Improvements <br />CITY OF STANTON I STANTON, CA <br />Design Engineer. Mr. Nguyen designed/drafted plans for the replacement of <br />approximately 1,400 LF of existing 12-inch-diameter VCP gravity sewer with <br />hydraulic deficiencies and structural defects. The sewer was replaced with a <br />15-inch-diameter VCP gravity pipe. Project also included street improvements. <br />