Laserfiche WebLink
CONTACT INFO <br />VANESSA PANETO, EIT <br />vanessa.paneto <br />@nv5.com <br />Civil Design <br />949.585.0477 <br />................................................................................................................................................................................. <br />Ms. Paneto has more than three years of experience and has worked on <br />EXPERIENCE <br />various civil engineering projects in Orange, San Bernardino, Riverside, and <br />3 years <br />Los Angeles counties. She has project engineer experience in preparing <br />EDUCATION <br />construction plans for public works and land development projects. She is <br />M.S. Civil Engineering <br />proficient utilizing hydrology/hydraulic software for preparation of hydrology, <br />WQMP/LID, and SWPPP reports. <br />B.S. Civil Engineering <br />LICENSES <br />Project Experience <br />Engineer-in-Training (CA) <br />................................................................................................................................................................................. <br />No. 152200 <br />PCH Water Main Replacement <br />AVAILABILITY <br />CITY OF LOMITA I LOMITA, CA <br />Assistant Engineer. Ms. Paneto's responsibilities include plans and <br />70% <br />specifications for the design of the PCH water main replacement project from <br />Narbonne Avenue to Eshelman Avenue. This project consists of replacing the <br />existing dual 6-inch water mains and includes the installation of fire hydrants, <br />service laterals, valves, blow -offs, air release valves, and other associated <br />water appurtenances. <br />Corryne and Slauson Area Main Replacements and Abandonment <br />GOLDEN STATE WATER COMPANY I CULVER CITY, CA <br />Assistant Engineer. Ms. Paneto assisted in the design and draft of plans for the <br />replacing and abandoning of 1,600 LF of undersized and old 4-inch, 6-inch, <br />and 10-inch cast iron water mains with 8-inch and 12-inch PVC in the public <br />right-of-way (ROW). The purpose of this project is to improve water quality, <br />increase fire flows, reduce maintenance costs, and improve system reliability <br />within the GSWC service area. This project is set to be constructed in five <br />sequences. <br />Union Avenue Sewer Lateral Rerouting <br />CITY OF WHITTIER I WHITTIER, CA <br />Associate Engineer. Ms. Paneto assisted in developing plans, specifications <br />and estimates for the replacement of an existing 85-year-old 6-inch water main <br />that runs in Union Avenue from Philadelphia Street to Penn Street along Pierce <br />Avenue. Due to its inaccessibility because of development of the area, the <br />improvements would relocate the sewer main to a more accessible location <br />along with manholes. New mains are to be designed with 8-inch PVC sewer <br />lines. <br />184th Street and Bailey Drive Storm Drain <br />CITY OFTORRANCE I TORRANCE, CA <br />Assistant Engineer. Ms. Paneto helped prepare plans for this project <br />that included the analysis, survey, and utility coordination, as well as the <br />preparation of plans, specifications and estimates for the construction of a <br />storm drain within 184th Street from Prairie Avenue to Bailey Drive and within <br />V 5 Bailey Drive from 184th Street to 185th Street in order to alleviate the local <br />ponding/flooding in the area. <br />