Laserfiche WebLink
Carl Wallace, PE <br />Project Manager —' <br />On -Call Public Works & Land Development Inspection Services, City of Irvine, CA <br />Project Manager for providing inspection services for various projects within the City. Oversees and monitors <br />inspection staffing and provides Quality Assurance for our staff. Select projects include: <br />• 2013/14/15/16/18/1®itywide Paving and Slurry Seal ($5M/$9M/6M/$6M/$10M'$7.5M) <br />• Irvine Boulevard Pedestrian Bridges ($4M) <br />• Irvine Boulevard Improvements ($124 <br />• Great Park Development Project ($400M) <br />• Five Points Development Project ($1004 <br />• Alton Storm Drain ($6M) <br />• City Hall Fueling Modification ($14 <br />• San Diego Creek Channel Improvements ($1 Mj <br />• Marine Way Road Improvements ($250K) <br />Coachella Valley Water District, Palm Desert, CA <br />As Project Manager, responsibilities include staffing projects and providing QA/QC for inspection staff. Also <br />coordinates the staff training program for this on -call contract. Projects include transmission, distribution and <br />lateral pipeline, new fire hydrants, valves and appurtenances, Cathodic test stations, vaults, sewer laterals, <br />manholes and structures. Select projects include: <br />• Washington Street Lift Station Rehabilitation ($14M) <br />• Burr Street Lift Station ($5.8M) <br />• Water Reclamation Plant No. 2 Improvement ($2.14 <br />• Cathedral City Pipeline Improvements ($1 4 <br />• Adams Street Crossing and Storm Drain ($700K) <br />• Deep Canyon Channel and Parkview Drive ($1.'M) <br />• Water Supply Wells ($4M) <br />• Slope Protection ($2.5M) <br />• Avenue 59 Drain Replacement ($675K) <br />Woods Valley Water Reclamation Facility, Phase 2 Expansion, Valley Center Water District, Valley <br />Center, CA <br />Project Principal for this $10.5Mfacility capacity upgrade from 75,000 GPD to 275,000 GPD. Project duties <br />include oversight of project, quality control of services provided to the District and overall client satisfaction. <br />Charlan Road Recycled Pond Project, Valley Center Water District, Valley Center, CA <br />Project Principal for this $5M recycled pond construction project. Project duties include oversight of project, <br />quality control of services provided to the District and overall client satisfaction. <br />South Collection System, Valley Center Water District, Valley Center, CA <br />Construction Manager for this $2M project to add new collection with 17,000' of HDPE force main trunk line <br />down main arterial (Valley Center Road). Project duties include oversight of project, quality control of services <br />provided to the District and overall client satisfaction. <br />As -Needed Construction Management and Inspection Services, Rancho California Water District, CA <br />Contract Manager for construction services contract with the District. Overseeing staff for the following <br />projects: <br />• Temecula Parkway Interchange, Interstate 15/State Route 79 South Ultimate Interchange ($23M) — <br />Waterline relocation during the construction of a new interchange <br />• Madison Avenue 56" Pipe Replacement ($4M) — Pipeline relocation project in support of a new French <br />Valley/1-15 interchange <br />• New Recycled Pond No. 5 ($8M) — Recycled Pond and rehab of other ponds with 1 M CY's of earthwork <br />• District Tank Coating Inspection Project — Inspection of new coating rehabilitation for five steel <br />reservoirs <br />C7alllue.ssssoclues City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-1 t S 37 <br />