Laserfiche WebLink
Barry Safa, PE, B-Lic <br />Senior Construction Manager <br />Mr. Safa is a registered Civil Engineer and a licensed Contractor with 35 <br />Experience <br />years of experience in resident engineering, construction inspection, <br />35 years <br />construction engineering and project management on a variety of <br />Education <br />construction projects including type V buildings, concrete buildings, <br />Construction Management, <br />University of CA, Los Angeles <br />industrial buildings, storm drain facilities, water and wastewater facilities, <br />roadway and structures. These have included major arterial roadways, <br />MS, Management, State University <br />large reinforced concrete structures, retaining walls, reinforced concrete <br />of New York <br />flood control channels and, box culverts and other structures, water <br />BS, Civil Engineering <br />reservoirs, pump stations, aeration basins, clarifiers, sludge drying beds, <br />Registrations <br />pipelines, industrial plants and other public works projects. His experience <br />Registered Civil Engineer, CA <br />includes contract administration, CPM scheduling, claim dispute resolution, <br />#C37137 <br />partnering, construction inspection and material sampling and testing. His <br />Licensed Contractor, CA <br />experience in maintenance engineering has provided him with awareness <br />Class B, Buildings (Inactive) <br />of maintenance and operation issues, which benefits project owners. Barry <br />#423436 <br />also brings design experience that enables him to effectively communicate <br />with the design engineers to the benefit of his projects. His design <br />experience includes meeting with the project owner to determine the owner's <br />needs, design calculations, <br />studies, design details, preparation of plans and specifications, and other design engineering tasks. His project <br />management experience includes contract administration, project scheduling, <br />claim prevention, managing <br />technical staff and working closely with the owner. <br />Linda Vista Complex Reservoir and Pumping Station, City of Anaheim Water Utilities Department, CA <br />As a Construction Manager of the $8.5M project, supported the City staff in managing the construction of a <br />4MG pre -stressed concrete reservoir, using DYK technology. The project also <br />included the construction of two <br />separate pumping stations for two different zones located in the same site. <br />Water Pump Station Upgrade, City of Garden Grove, CA <br />As Construction Manager and Resident Engineer, oversaw the construction work during the upgrade of a water <br />pump station consisting of three engine -driven booster pumps and an engine -driven well production pump. The <br />work consisted of replacing engines and pumps with new equipment, as well replacement of discharge piping, <br />building modifications, and instrumentation. The project was completed successfully as the construction was <br />completed with only planned disruptions of service. The facility pumped water into the City's distribution system <br />at all times, except short shut -down periods lasting only a few hours each time. <br />Wastewater Treatment Plant Expansion, City of Riverside Public Works Department, CA <br />As Project Manager, provided oversight of construction quality control during the construction phase of the <br />wastewater treatment plant expansion project. The project required providing construction inspection at the job <br />site, as well as equipment quality control at the manufacturer's facilities in a foreign country. The owner <br />required design of electrical facilities for the plant expansion. This service was provided using qualified <br />electrical engineers with Project Manager's oversight and coordination with City staff. Responsibilities included <br />documentation of key construction activities on behalf of the City. <br />Concrete Sewer Rehabilitation Program, City of South Gate, CA <br />As Project Manager for engineering services, provided engineering services for a three-year prioritized <br />program for rehabilitation of the City's sewer system. This phase of the sewer rehabilitation was funded by a <br />South Gate Water Authority $30M bond issue and will encompass the repair, replacement, and rehabilitation of <br />approximately 320,000' of concrete sewer pipe. Most of the rehabilitation included CIPP sewer rehabilitation <br />from 6" to 36" pipe. Other pipe rehabilitation methods included pipe bursting, directional drilling and traditional <br />replacement. <br />Sewer Rehabilitation Project, City of Palos Verdes Estates, CA <br />Resident Engineer/Inspector for the evaluation and rehabilitation of section of damaged and old sewer lines <br />throughout the City. Provided evaluation of section to replace prior to slip lining (CIPP) and inspected all <br />methods of the rehabilitation work. <br />Sewer Rehabilitation Project, City of Rancho Palos Verdes, CA <br />Resident Engineer/Inspector for the evaluation and rehabilitation of section of damaged and old sewer lines <br />dllM: associates City of Santa Ana i Water Resources Construction Management and Inspection Services No. 19-118 38 <br />