Laserfiche WebLink
Bryan Tuschhoff, CMIT, QSP, PMP <br />Senior Construction Manager <br />Mr. Tuschhoff brings 30 years of experience in Project Management, <br />Construction Management and Construction Inspection. He has worked on <br />a diverse group of projects, which have included underground installation <br />of wet and dry utilities including electrical, sewer, water, storm drain, oil <br />and jet fuel pipelines, all types of asphalt paving operations, structural and <br />architectural concrete placement. His experience also extends to mass <br />grading earthwork operations, pile driving, caisson column installation, <br />environmental remediation and mitigation, surface water/storm water <br />management, SWPPP compliance, structural and architectural steel <br />erection, and SCADA system installation. He has worked on new <br />construction projects as well as rehabilitation and improvement projects. <br />His comprehensive experience provides him with the ability to identify <br />potential project issues early and propose various mitigation options. <br />Experience <br />30 years <br />Education <br />BS, Physical Geography & Earth <br />Science, Western Illinois University <br />Project Management Certification, <br />University of California, Irvine <br />Registrations <br />Qualified SWPPP Practitioner, QSP <br />#20944 <br />Certified Inspector Sediment & <br />Erosion Control (CISEC) #0444 <br />Street and Storm Drain Improvement for Imperial Highway, City of <br />Yorba Linda, CA <br />Provided construction management and construction inspection services on this $3.2M project that included <br />the installation of approximately 1,500 of 48", 30" & 18"RCP storm drain pipe and associated manholes, <br />junction structures and catch basins through the commercial use district of downtown Yorba Linda. <br />Construction of this six-month project also included street widening of a quarter mile section of Imperial <br />Highway, Yorba Linda Boulevard, Lakeview Avenue and Lemon Drive, and included new asphalt pavement, <br />traffic signal and street lighting modifications and improvements, installation of new PCC curb/ gutter, sidewalk, <br />access curb ramps, decorative sidewalk and crosswalk pavers and extensive landscape enhancements. <br />Capital Improvement Projects, Elsinore Valley Municipal Water District, Lake Elsinore, CA <br />Lead Construction Manager for this multiple project program of Capital Improvement Water and Recycled <br />Water projects. The $2.75M CIP program included five individual projects with more than 16,000 of 6", 8", 12" <br />and 16"ductile iron distribution pipeline and associated water meters (included 1,509 new Automatic Reading <br />Water Meters), 1,500 of 4" PVC recycled waterline with 3,500 sprinkler heads, replacement of inoperative and <br />broken gate valves at four intersections, and the interconnection of two water pressures zones. Responsible <br />for organizing and conducting pre -construction meetings, setting up the document control system and getting <br />the construction inspection team ready to begin work. <br />AMI Phases 11 & III and DCU Poles, Elsinore Valley Municipal Water District, Lake Elsinore, CA <br />Construction Manager for this $4M Grant Funded Advanced Metering Infrastructure (AM[) Phases 11 & III and <br />DCU Poles Projects. The project included three separate contracts for the installation of more than 46,000 new <br />Aclara Water Meter Transmission Units (MTUs) and 11 Dita Collection Unit concrete and wooden antenna <br />poles to create an advanced meter data management system for the District via Aclara's proprietary network. <br />Rio Vista Clearwell No. 2 Improvement, Castaic Lake Water Agency, Santa Clarita, CA <br />Construction Manager/Inspector for this $3.8M project, project was partially funded by an EPA Grant. The <br />modifications to this 15MG treated water clearwell included: demolition and removal of the existing <br />geomembrane liner, baffles, and floating cover, earthwork grading within the clearwell confines, installation of <br />drain pipes, liner leakage collection pipes, concrete anchor curbs, geomembrane liner, CSPE baffles, and <br />CSPE floating cover, installation of water quality monitoring system, site electrical, SCADA improvements, <br />perimeter railing, modifications to existing access platforms and restoration of existing asphalt pavement. <br />Duties included construction management, construction inspection, processing submittals, RFI's, and progress <br />payments, labor compliance and certified payroll, conducting weekly project progress meetings and preparing <br />meeting agenda's and minutes, quality assurance and quantity verification, dechlorination and flushing, <br />monitoring the contractor's safety plan and construction schedule, ensuring the contractor's operations do not <br />disrupt the operations of the active water treatment plant, SWPPP monitoring, daily report preparation and <br />photographic documentation. <br />Plant 40 Pump Station Improvement, East Valley Water District, Highland, CA <br />Construction Manager/Inspector during construction of this $81 AC pump station improvement project that <br />included four vertical turbine pumps and motors, flow meters, instrumentation, telemetry and SCADA control <br />C9alI.— I nssoclates City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 47 <br />