Bryan Tuschhoff, CMIT, QSP, PMP
<br />Senior Construction Manager
<br />Mr. Tuschhoff brings 30 years of experience in Project Management,
<br />Construction Management and Construction Inspection. He has worked on
<br />a diverse group of projects, which have included underground installation
<br />of wet and dry utilities including electrical, sewer, water, storm drain, oil
<br />and jet fuel pipelines, all types of asphalt paving operations, structural and
<br />architectural concrete placement. His experience also extends to mass
<br />grading earthwork operations, pile driving, caisson column installation,
<br />environmental remediation and mitigation, surface water/storm water
<br />management, SWPPP compliance, structural and architectural steel
<br />erection, and SCADA system installation. He has worked on new
<br />construction projects as well as rehabilitation and improvement projects.
<br />His comprehensive experience provides him with the ability to identify
<br />potential project issues early and propose various mitigation options.
<br />Experience
<br />30 years
<br />Education
<br />BS, Physical Geography & Earth
<br />Science, Western Illinois University
<br />Project Management Certification,
<br />University of California, Irvine
<br />Registrations
<br />Qualified SWPPP Practitioner, QSP
<br />#20944
<br />Certified Inspector Sediment &
<br />Erosion Control (CISEC) #0444
<br />Street and Storm Drain Improvement for Imperial Highway, City of
<br />Yorba Linda, CA
<br />Provided construction management and construction inspection services on this $3.2M project that included
<br />the installation of approximately 1,500 of 48", 30" & 18"RCP storm drain pipe and associated manholes,
<br />junction structures and catch basins through the commercial use district of downtown Yorba Linda.
<br />Construction of this six-month project also included street widening of a quarter mile section of Imperial
<br />Highway, Yorba Linda Boulevard, Lakeview Avenue and Lemon Drive, and included new asphalt pavement,
<br />traffic signal and street lighting modifications and improvements, installation of new PCC curb/ gutter, sidewalk,
<br />access curb ramps, decorative sidewalk and crosswalk pavers and extensive landscape enhancements.
<br />Capital Improvement Projects, Elsinore Valley Municipal Water District, Lake Elsinore, CA
<br />Lead Construction Manager for this multiple project program of Capital Improvement Water and Recycled
<br />Water projects. The $2.75M CIP program included five individual projects with more than 16,000 of 6", 8", 12"
<br />and 16"ductile iron distribution pipeline and associated water meters (included 1,509 new Automatic Reading
<br />Water Meters), 1,500 of 4" PVC recycled waterline with 3,500 sprinkler heads, replacement of inoperative and
<br />broken gate valves at four intersections, and the interconnection of two water pressures zones. Responsible
<br />for organizing and conducting pre -construction meetings, setting up the document control system and getting
<br />the construction inspection team ready to begin work.
<br />AMI Phases 11 & III and DCU Poles, Elsinore Valley Municipal Water District, Lake Elsinore, CA
<br />Construction Manager for this $4M Grant Funded Advanced Metering Infrastructure (AM[) Phases 11 & III and
<br />DCU Poles Projects. The project included three separate contracts for the installation of more than 46,000 new
<br />Aclara Water Meter Transmission Units (MTUs) and 11 Dita Collection Unit concrete and wooden antenna
<br />poles to create an advanced meter data management system for the District via Aclara's proprietary network.
<br />Rio Vista Clearwell No. 2 Improvement, Castaic Lake Water Agency, Santa Clarita, CA
<br />Construction Manager/Inspector for this $3.8M project, project was partially funded by an EPA Grant. The
<br />modifications to this 15MG treated water clearwell included: demolition and removal of the existing
<br />geomembrane liner, baffles, and floating cover, earthwork grading within the clearwell confines, installation of
<br />drain pipes, liner leakage collection pipes, concrete anchor curbs, geomembrane liner, CSPE baffles, and
<br />CSPE floating cover, installation of water quality monitoring system, site electrical, SCADA improvements,
<br />perimeter railing, modifications to existing access platforms and restoration of existing asphalt pavement.
<br />Duties included construction management, construction inspection, processing submittals, RFI's, and progress
<br />payments, labor compliance and certified payroll, conducting weekly project progress meetings and preparing
<br />meeting agenda's and minutes, quality assurance and quantity verification, dechlorination and flushing,
<br />monitoring the contractor's safety plan and construction schedule, ensuring the contractor's operations do not
<br />disrupt the operations of the active water treatment plant, SWPPP monitoring, daily report preparation and
<br />photographic documentation.
<br />Plant 40 Pump Station Improvement, East Valley Water District, Highland, CA
<br />Construction Manager/Inspector during construction of this $81 AC pump station improvement project that
<br />included four vertical turbine pumps and motors, flow meters, instrumentation, telemetry and SCADA control
<br />C9alI.— I nssoclates City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 47