Laserfiche WebLink
Bryan Tuschhoff, CMIT, QSP, PMP <br />Senior Construction Manager <br />(a <br />system installation, electrical and lighting system improvements and structural steel canopy installation. <br />Responsible for factory witness testing of the pumps and motors, approval of progress payments and change <br />orders, inspection and documentation of the plant construction work, preparation of daily reports, photo <br />documentation, recording and observation of pressure testing, chlorination and dechlorination, plant startup <br />and commissioning. <br />Plant 137 & Live Oak Road Pipeline Replacement, East Valley Water District, Highland, CA <br />Construction Manager/Inspector for the installation of approximately 3,185 of 12"ductile iron waterline and <br />appurtenances through the rocky foothills of a residential neighborhood. Construction of this $717K project also <br />included demolition of existing treatment train equipment and construction of facility site improvements at Plant <br />137. Responsible for daily observation, documentation and digital recording of the contractor's work, <br />coordination and scheduling of material testing and quality control, monitoring traffic control measures and <br />documenting storm water BMP installation and maintenance, community relations and coordination with public <br />utility agencies, attending bi-weekly progress meetings, assisting in the processing of change orders, <br />construction schedule reviews, progress payments, RFI's, submittals and checking site safety procedures. <br />Sewer Main Construction, East Valley Water District, Highland, CA <br />Project Manager while also providing oversight of construction inspection services for construction of this <br />$300K onsite sewer improvement project located in the new residential housing track (WS 0000 Tract #17681). <br />Construction included installation, backfill, pressure testing and tie-in to existing facilities of 2,071' of 8" PVC <br />sewer main line, construction of 14 sewer manholes, and installation of 64 new sewer service laterals. <br />Responsibilities included coordination with the EVWD Project Manager, construction scheduling, budget <br />management, review of daily construction reports and photographic documentation, traffic control and punch <br />list completion. <br />Small Meter Replacement Project (Southwest District), Golden State Water Company, Los Angeles, CA <br />Project Construction Manager during the installation of over 5.000 new water meters ranging from %" to 2" <br />throughout various communities. This $700K project includes close coordination with operations and <br />maintenance staff to schedule work of two contractors within the constraints of the billing cycles and meter <br />reading routes. Construction inspection services included contract compliance, material management of owner <br />provided meters and materials to two separate contractors, coordination with multiple City jurisdiction and <br />management staff. <br />Utility Relocation, SbX - E Street Transit Corridor Bus Rapid Transit, San Bernardino Municipal Water <br />District, CA <br />Construction Manager/Inspector for the water utility relocation portion of project. This $191.7M rapid transit <br />improvement project included 15.7miles of new public transportation bus route through the downtown San <br />Bernardino area. Responsibilities included inspection of the contractor's work for the relocation and/or <br />replacement of existing water main pipeline, fire hydrants, commercial water meters, associated service <br />laterals and appurtenances during alternating day and night work shifts. Duties included extensive daily <br />coordination with SBMWD and the contractor to successfully execute water service interruptions and/or full <br />water main shutdowns, chlorination, flushing and residual chlorine testing, bacteriologic sampling analysis, <br />preparation of daily reports and photo documentation, preparation of tie -sheet record documents and creation <br />of as -built drawings. <br />Project Management and Construction Management Services, City of Murrieta, CA <br />Currently providing Project Management and Construction Management Services to the City's Parks & <br />Recreation Department. Responsibilities encompass project and construction management of the Pre - <br />Construction, Construction and Post Construction phases of the work including coordination with City <br />Management and staff; Pre -Construction Phase bid analysis and tabulation, reference check, license, bid <br />bond, surety and insurance confirmation, file structure set-up, establishment of CDBG federal funding <br />requirements, pre -construction meeting, photos, and contract administration; Project Management and <br />Construction Management of the Construction Phase including construction contract administration submittal <br />and RFI, RFQ, COR, CCO, CDBG federal funding compliance, progress payment review and processing, <br />weekly project progress meetings, construction inspection, building and safety department review; and Post <br />C7a11uesnssoclates City of Santa Ana I Water Resources Construction Management and Inspection Services No. 10-118 48 <br />