Laserfiche WebLink
David Watson <br />Construction Manager <br />REGISTRATION <br />Professional Engineer/ <br />Civil/CA/#63129 <br />EDUCATION <br />BS/Civil Engineering/ <br />California State <br />University, Fresno <br />AS/Engineering/ <br />Allegheny Community <br />College <br />PROFESSIONAL <br />AFFILIATIONS <br />California Water <br />Environment Association <br />Five S Society <br />American Society of Civil <br />Engineers <br />EXPERIENCE <br />30 years of experience <br />David Watson has experience supervising design team engineers, <br />construction managers, resident field engineers, and construction <br />inspectors. He has developed construction inspection training programs, <br />trained associates and professional staff, coordinated project and <br />discipline engineers, and managed sub -consultants. He brings a high <br />level of skills to the team in performing value engineering and design cost <br />reduction, risk reduction and claims reduction reviews, constructability <br />and bid -ability reviews. He also has experience with project partnering <br />groups and project delivery teams. His experience includes regulatory <br />agency coordination; including environmental issues, SWPPP, California <br />Department of Fish & Game, US Army Corps of Engineers, California <br />Regional Water Quality Control Board, US Department of Interior, US <br />Fish & Wildlife Services, UPRR, Metrolink, Caltrans, OSHA, and US <br />Bureau of Mines. <br />Experience <br />Camarillo Sanitary District Chemical Disinfection Conversion <br />Project, City of Camarillo, CA: Construction Management and <br />Inspection services. Provides construction management services for <br />this $0.93M project. Construction of two (2) new chemical delivery <br />systems, sodium hypochlorite and sodium bisulfite, converted from <br />gaseous chlorine to liquid hypochlorite. System includes four (4) <br />storage tanks, metering pumps, and MCC control systems, PLC Units, <br />chemical injection vaults and tank structural cover with slab and overflow <br />containment. <br />Cater Water Treatment Facility Filter Expansion, City of Santa <br />Barbara, CA: Field Engineer. Provided construction inspector for this <br />$14M project as manufacturer's representative for proper installation of a <br />Monofl or® HD underdrain water filtration equipment. <br />DSRSD Wastewater Treatment Plant Improvements, City of Dublin, <br />CA: Construction Manager. $36M project; The project increased the <br />average dry weather flow (ADWF) from 11.5 MGD to 17 MGD. Project <br />highlights include the construction of several large concrete water <br />bearing structures, including sedimentation basins, biological nutrient <br />removal basins, anaerobic digester, headwork's treatment facility, <br />odor control facilities, electrical and other process enhancements. <br />Responsibilities included performing Project Management and <br />Construction Inspection Services: training of inspection and District staff, <br />assuring contractor efficiency and progress relative to the construction <br />schedule, and coordination with the Program Manager with regard to <br />potential contract change orders. <br />Wastewater Treatment Facility Additions, City of Reedley, CA: <br />Construction Manager. Responsibilities included all resident engineering <br />functions.This centrifuge project included construction of a new <br />centrifuge building including a polymer thickening system which produces <br />PSOMAS UP No. 19-118 1 _ _ _._ _ - - _-.a City of Santa Ana <br />