My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS-A-2020-076-03
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS-A-2020-076-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:51:49 AM
Creation date
5/6/2020 4:23:23 PM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS
Contract #
A-2020-076-03
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
1/1/1900
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
David Watson <br />(Continued) <br />a 22 percent cake from a Y percent WAS system, included a new WAS <br />pump station and associated yard piping, extended aeration process <br />and all accompanying electrical and instrumentation processes. Project <br />included the installation of new asphalt roadway paving striping and <br />sealing. <br />Trickling Filter Upgrade Project Visalia Water Conservation Plant <br />Filter Upgrade Project, City of Visalia, CA: Resident Engineer. Trickling <br />filter upgrade project. Performed field and office project management <br />services, review submittals, RFls, RFPs, PCls, and Contractor partial <br />payment estimates, resolve disputes. The project required rehabilitation <br />and installation of four 180 foot diameter VFD controlled, gear -driven <br />rotary mast distributors and replacement of conventional rock media <br />with high rate plastic media, a new pump station, new piping, electrical <br />and instrumentation systems. Responsibilities included all resident <br />engineering functions including review of submittals and shop drawings, <br />answering RFIs, preparing and evaluating RFPs and reviewing value <br />engineering proposals. Project included the installation of new asphalt <br />roadway paving striping and sealing. <br />Recycled Water Pipeline Project, Camrosa Water District Project <br />City of Camarillo, CA: Resident Engineer, for the Camrosa Water <br />District Project Recycled Water Pipeline project. The pipeline elements <br />include 43,000 linear feet of steel cement mortar lined and coated pipe. <br />The pipeline was constructed in sensitive agricultural area. The project <br />included the open cut excavation across the environmentally sensitive <br />Conejo Creek including open channel diversion of the creek flow while <br />maintaining fish access to feeding areas. Project included the installation <br />of new asphalt roadway paving striping and sealing. <br />Wastewater Treatment Facility Additions, City of Reedley, CA: <br />Construction Manager. Responsibilities included all resident engineering <br />functions. This centrifuge project included construction of a new <br />centrifuge building including a polymer thickening system which produces <br />a 22 percent cake from a % percent WAS system, included a new WAS <br />pump station and associated yard piping, extended aeration process <br />and all accompanying electrical and instrumentation processes. Project <br />included the installation of new asphalt roadway paving striping and <br />sealing. <br />Wastewater Treatment Facility Clarifier Addition and RAS Pump <br />Station Projects, City of Exeter, CA: Construction Manager for the City <br />of Exeter, California. Responsibilities included all resident engineering <br />functions. The project included the construction of a new secondary <br />clarifier, RAS pump station, recharge basin and effluent irrigation <br />distribution system. <br />RFP No. 19-113 1 Ci1V oI S3' PSOMAS <br />
The URL can be used to link to this page
Your browser does not support the video tag.