Laserfiche WebLink
Chris McNary <br />Construction Manager <br />EDUCATION <br />2011 /BA/Project <br />Management/ITT <br />Technical Institute <br />2010/AA/Computer <br />Drafting & Design/ITT <br />Technical Institute <br />EXPERIENCE <br />With Psomas for 12 <br />years <br />Chris McNary has been responsible for project management for capital <br />improvement projects. In this capacity, Chris maintained databases for <br />all construction logs, provided construction inspection and observation, <br />coordinated with client representatives, and conducted and documented <br />construction meetings with the contractors. <br />He has served as both Assistant Project Manager and Inspector. In his <br />role as Assistant Project Manager, he was responsible for supporting the <br />Project Manager with project documentation, tracking, and documentation <br />of submittals, RFIs, change order management, claims management, <br />schedule and CPM analysis, labor compliance, correspondence, progress <br />pay estimates, material sampling/testing coordination, utility coordination, <br />and as -built documentation coordination. As an Inspector, Chris was <br />responsible for field inspections and documentation, continual review of <br />plans and specifications, coordination with contractor schedules for testing, <br />site labor compliance, attending weekly progress meetings, regulatory <br />agency permit mitigation monitoring, documentation of contract item <br />quantities, documentation of extra work and claim situations, as-builts <br />records, provision of pictorial and/or video logbook of construction activities, <br />maintenance of as -built drawings, and development of punch list items with <br />follow-up corrective measures to close out the construction activities. <br />Experience <br />On -Call Project and Construction Management Services, City of <br />Hermosa Beach, CA: Construction Inspector for various state and <br />federally funded capital improvement projects for the City of Hermosa <br />Beach. Services included consultant selection and management, <br />complete project management from planning through construction <br />phase services, bond and grant management, bid and award services, <br />construction management and inspection, and project close-out. Capital <br />improvement projects included Pier Renovation Phase III, Aviation <br />Street Tree Project, Pier Clock Barrier, Pier Concrete Deck Treatment, <br />Manhattan Avenue Street Improvements, Pier Avenue and North Parking <br />Structure Restriping, Beach Restroom Rehabilitation, Community Center, <br />Various Street Improvements, and Police Department HVAC Upgrades. <br />Long Beach Transit Mall Improvements, Long Beach, CA: Construction <br />Manager for the Long Beach Transit Mall Improvements Design -Build <br />project. The improvements to the Long Beach Transit Mall were on <br />First Street between Long Beach Boulevard and Pacific Boulevard. <br />The construction involved replacement of eight bus shelters and kiosks; <br />creation and enhancement of safe waiting areas; improving transit <br />information displays; removing and replacing public sidewalks to meet ADA <br />standards; and adding landscaping and public art to visually promote public <br />transportation, including its connections with regional bus and light rail <br />service. The project required close coordination with local businesses and <br />residents so that they were aware of the construction activities on a daily <br />basis and the traffic control plans were implemented. The corridor remained <br />open for light rail service during the entire construction period. <br />PSOMAS PH Na '19 113 -_ , _ Clly Of Santa Ana <br />