My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WILLDAN ENGINEERING (5)
Clerk
>
Contracts / Agreements
>
W
>
WILLDAN ENGINEERING (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 10:07:02 AM
Creation date
5/6/2020 4:25:42 PM
Metadata
Fields
Template:
Contracts
Company Name
WILLDAN ENGINEERING
Contract #
A-2020-076-02
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Destruction Year
2028
Notes
CTRAX
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Administrative Process <br />Log aril process All <br />Motdtot Track Couslructwu Contractor rullate EmpkWce <br />rslmcted and Work Quality Submntahand Intemews <br />Nerluests <br />UJILIL Labor and RtMe ' and Assht ptcmde city will <br />frtuipmentpurxtanI wllh Resolution of Cu tiudron File <br />to IAPM All lechneral Data l lnseout <br />and ltwec Ili„i,n,rntennn <br />Willdan's team is unique in that it has a natural quality assurance/control system. Through its structure as <br />an integrated unit with close communication between team members and interlocking responsibilities that <br />provide good coverage of all elements of construction engineering, it incorporates minimal overlap of <br />duties to avoid misunderstandings of assigned responsibilities and reduce costs. <br />The assigned resident engineer/construction manager is responsible for daily decisions and assignments <br />of specific duties while monitoring the success and completion of project construction. The resident <br />engineer/construction manager has specific administrative duties that include review of field activities. <br />The resident engineer/construction manager will institute a system of periodic reviews of the field file for <br />conformance with Willdan's in-house filing system and LAPM. The inspectors will have specific <br />assignments and move the products of their reporting to the resident engineer/construction manager. <br />This bi-level approach has proven to be effective for Willdan because the likelihood of a missed or <br />incorrect item is essentially eliminated with this multi -level control. <br />Additionally, our resident engineer/construction manager will maintain a project -first philosophy with the <br />contractor. When this is achieved, construction is easy, straightforward, and accomplished with a <br />minimum of issues. We are a team — right is right and wrong is wrong for all parties. When this is <br />established, it creates a fair environment for all; and, project success is achieved. <br />Our approach to issue resolution is to: <br />• Obtain and document the facts surrounding the issue <br />• Develop reasonable solutions in conjunction with the contractor and City's Project Manager <br />• Respond quickly and effectively so that job progress and quality do not suffer <br />Through close communication with the City's project staff, timely corrective action is taken to alleviate <br />potential adverse impacts of work progress, costly change orders, and construction claims. <br />Community Outreach <br />Any infrastructure improvement project has the potential to cause concerns for citizens who rely on this <br />infrastructure for daily travel or for the affected businesses in the project vicinity. Willdan has experience <br />conducting community outreach programs to address these concerns and help gain public buy -in to <br />support a project. Typically, our efforts begin by identifying key stakeholders in the project area and <br />preparing and distributing mass mailers describing the projects scope, timeline, and expected results. <br />We conduct community workshops, general public outreach, and town hall meetings to inform the public <br />of project details and address the public's concerns/ideas about the project. If needed, Willdan's team <br />members visit impacted business owners to listen, acknowledge concerns, and strive to find solutions <br />addressing these concerns without negatively impacting project completion. <br />Utility Coordination and Permitting <br />Willdan's utility coordination staff is knowledgeable in effectively identifying existing utilities, providing <br />timely notification, and anticipating and resolving potential conflicts on plans and specifications. They are <br />keenly aware that utility identification and location are crucial to project planning and development and <br />Statement of Qualifications for Water Resources <br />12 Construction Management and Inspection SerAces <br />
The URL can be used to link to this page
Your browser does not support the video tag.