Paramount Boulevard Water System Improvements CIP 18-17, City of Downey, CA. Resident
<br />Engineer. Willdan provided construction management and inspection services for this water system
<br />improvement project on Paramount Boulevard from Firestone Boulevard to Florence Avenue. The
<br />project involved the installation of new ductile iron potable water main, gate valves, tees and bends,
<br />thrust blocks, and appurtenant fittings; installation of new fire hydrant assemblies, water service lines,
<br />meters and boxes; and other appurtenant work.
<br />Water Infrastructure Reliability Project, City of Santa Monica, CA. Resident Engineer. Willdan
<br />provided construction management and inspection services for the project. The project included the
<br />installation of over 4,800 LF of 8" and 12" water main gate valves, fire hydrants, and other appurtenant
<br />work at the following locations: 17th Street, Pearl Street to Ocean Park Blvd, Ocean Park Blvd, 14th
<br />Street to 18th Street, Ocean Avenue, Pico to Bay Street, Ashland Avenue, 3rd Street to 4th Street, Grant
<br />Avenue, 6th Street to Lincoln Blvd. This project was funded by the U.S. EPA Grant.
<br />Westside Water and Sewer Main Replacement Program Phase 1, City of South Gate, CA.
<br />Construction Manager. Responsible for overseeing contract administration, construction management,
<br />materials testing, and public works observation for this groundwater treatment project. Willdan provided
<br />construction management and public works observation services for the City's water and sewer main
<br />replacement project. The project included replacement of 1,000 LF of 12" DIP, 17,600 LF of 8" DIP, and
<br />950 LF of 6" DIP water mains, and 450 LF of 12" VCP and 1,700 LF of 10" VCP sewer mains. Existing
<br />water mains were abandoned in place, while the existing sewer mains were removed from the trench and
<br />new mains installed in the same alignment. Total construction cost was approximately $4.5 million. Mr.
<br />Bustos was responsible for contract administration, review and response to RFls, submittals, and change
<br />order requests, oversight of material testing and inspection services, and served as the primary point of
<br />contact for the City.
<br />River Road Bridge Water Pipelines, Western Municipal Water District, Corona, CA. Project
<br />Manager/Construction Manager. Willdan prepared plans and specifications for three parallel 20-inch
<br />welded steel water pipelines through the new River Road Bridge in Corona, CA. The Water line
<br />installation was part of Phase 2 bridge construction. Mr. Bustos's responsibilities included PS&E
<br />preparation, coordination with the bridge designer and other utility agencies installing new pipelines
<br />through the bridge, and oversight of construction management and inspection services.
<br />Goldspike Emergency Waterline Repair Project, Bear Valley Community Services District,
<br />Tehachapi, CA. Civil Engineer/Construction Manager. Willdan was retained to provide design and
<br />construction engineering services for the $4 million Bear Valley Road and Cumberland Road
<br />Rehabilitation project. As part of the project, the District's contractor completed an emergency waterline
<br />repair on Goldspike Rd, due to a water main blowout. The waterline repair included removal and
<br />replacement of approximately 400 LF of 4-inch PVC water distribution main, installation of new valves,
<br />replacement and reconnection of water services, and a new fire hydrant. Mr. Bustos aided with the
<br />preparation of the construction plans and served as the Construction Manager during construction.
<br />Bahama et al, Water Mains Plans, Park Water Company, CA. Project Engineer. Engineer of Record
<br />responsible for preparation of plans, specifications, and estimate for construction of water distribution
<br />mains in the City of Compton. The project included the installation of approximately 4,925 LF of 8" DIP,
<br />4,425 LF of 12" DIP, 31 water valves, 244 service connections, 24 fire hydrants, and other
<br />appurtenances. Mr. Bustos was the Lead Designer responsible for oversight of the preparation of the
<br />final construction documents.
<br />Las Virgenes Municipal Water District (LVMWD) Interconnect, Westlake Village, CA. Project
<br />Manager/Lead Designer. Willdan prepared water plans and profiles for 24" potable water main
<br />installation on Lindero Canyon Road from Thousand Oaks Blvd to the County line. Our team prepared
<br />concept level preliminary plans showing two proposed alignment alternatives for proposed Las Virgenes
<br />Municipal Water District 24" potable water main interconnect to Calleguas Municipal Water District's
<br />system. The work also included coordination of encroachment permitting with the City of Westlake
<br />Village. Mr. Bustos was the Lead Designer responsible for the oversight and direction of the final plans.