My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC - A-2020-076-01
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC - A-2020-076-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 4:24:04 PM
Creation date
5/6/2020 4:28:46 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-076-01
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACTINFO MATT GREER <br />maft.greer@nv5.com 949.585.0477 Construction Inspector <br />EXPERIENCE <br />Mr. Greer has 14 years of experience as a qualified Quality Control Inspection <br />14 years <br />and Construction Engineer with experience in the management and inspection <br />EDUCATION <br />of public works projects. His projects have included sewer and water -related <br />B.S. Civil Engineering <br />facilities, street rehabilitations, sidewalk improvements, slurry seal projects, <br />landscaping and irrigation, storm drains and vertical construction. He has <br />LICENSES/ <br />extensive experience dealing with the public, elected officials, contractors, <br />CERTIFICATES <br />architects and engineers. He has been responsible for monitoring construction <br />C2 Workzone Traffic <br />activities, preparing daily construction inspection reports, verifying compliance <br />Control Certificate <br />with plans and specifications, maintaining record drawings, final inspections, <br />OSHA 10-Hour <br />and assisting in field startups. <br />Construction Certificate <br />Project Experience <br />AVAILABILITY <br />.................................................................................................................................................................................... <br />20% <br />Staff Augmentation Inspection Services <br />IRVINE RANCH WATER DISTRICT I IRVINE, CA <br />Construction Inspector. Mr. Greer is providing inspection services for <br />domestic water, recycled water and sanitary sewer projects for the Irvine <br />Ranch Water District. His duties include tracking project progress, inspection <br />of grade and alignment of the water districts utilities, inspection of the testing <br />and approving the installation of the water districts utilities, creating and <br />maintaining the daily reports and project files, inspection of PCC structures <br />such as manholes, thrust blocks and overflow, headwall, spillway, vehicle <br />crossing and outflow PCC structures for NTS Basins. <br />Bette Davis Recycled Water Design -Build Project <br />CITY OF GLENDALE I GLENDALE, CA <br />Construction Inspector. Mr. Greer provided inspection services for this <br />$2.8M project completed through a single Design -Build Entity (DBE). The <br />project generally consists of construction of new 8-inch PVC recycled water <br />transmission line to Bette Davis Park. The final portion of the pipeline will <br />be constructed within the City of Los Angeles and will require permitting and <br />coordination with the City of Los Angeles. <br />Sewer Force Main and Lift Station Rehabilitation <br />CITY OF HUNTINGTON BEACH I HUNTINGTON BEACH, CA <br />Construction Inspector. Mr. Greer served as Construction Inspector for <br />the replacement of an existing sewer lift station and force main. The project <br />included the construction of a concrete vault to house the new station, pumps, <br />valves, and metering equipment, as well as electrical and telemetry systems. <br />The project also included the construction of new sewer and force mains, and <br />manhole structures. The existing lift station had to remain in operation while <br />the new facilities were being constructed. <br />Water and Sewer Main Systems <br />CITY OF CATHEDRAL CITY I CATHEDRAL CITY, CA <br />Construction Inspector. Mr. Greer served as construction inspector for the <br />construction of 30,000 LF of main line VCP sewer, 20,000 LF of VCP sewer <br />laterals, 18,000 LF of 24-inch to 72-inch RCP storm drains, 30,000 LF of DIP <br />water main and 1,000,000 square feet of street improvements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.