My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC - A-2020-076-01
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC - A-2020-076-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 4:24:04 PM
Creation date
5/6/2020 4:28:46 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-076-01
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACT INFO RAY FARNAGHI, LEED GA <br />ray.farnaghi@nv5.com Construction Inspector <br />949.585.0477 p <br />EXPERIENCE Mr. Farnaghi has more than 17 years of successful demonstrated experience <br />17 years in the construction management and inspection of large-scale and complex <br />EDUCATION projects. Mr. Farnaghi's experience includes several large facility and park <br />B.S. Civil Engineering renovations and improvements. He understands the balance between working <br />effectively with architects, engineers, contractors, inspectors, and construction <br />LICENSES/ crews. He works diligently to ensure that all construction activities have a <br />CERTIFICATES strategic plan and can offer sensible resolutions to avoid delays. <br />LEED GA <br />AVAILABILITY Project Experience <br />40%................................................................................................................................................................................... <br />SGVMWD Interconnect and Site Improvements <br />CITY OF AZUSA LIGHT AND WATER I AZUSA, CA <br />Construction Inspector. Mr. Farnaghi is providing construction inspection <br />services for the SGVMWD Interconnect and Site Improvements project. His <br />role includes reviewing submittals, responding to RFIs, reviewing change <br />orders, and coordinating with the Engineer, the City and other agencies <br />as needed. The project consists of the construction of an interconnection <br />pipeline, including approximately 18-inch class 350 ductile iron pipe, 14-inch <br />and 18-inch schedule 40 CML&C steel pipe, including valves, connections, <br />abandonments and appurtenances. Work also includes a 14-inch pressure - <br />reducing and flow -control station, concrete vault replacement, AC pavement <br />resurfacing and reconstruction, PCC sidewalks, curb and gutter. <br />Arantine Hills Sewer and Water Infrastructure Projects <br />CITY OF CORONA I CORONA, CA <br />Inspector. Mr. Farnaghi provided inspection services for the $14.7M three- <br />phase Arantine Hills sewer and water improvement projects to provide the <br />necessary infrastructure for the Arantine Hills Development Project. The <br />project involved the construction of a buried cast -in -place sewer lift station with <br />above -grade controls. This was connected to a second project to construct <br />the sewer force main with fused HDPE pipe via conventional open trench and <br />trenchless jack -and -bore sewer construction along arterial streets and Caltrans <br />ROW, forming 4 miles of pipeline. Relocation of 3,300 LF of potable water <br />line also was required to install the new force mains. A third project managed <br />simultaneously was the construction of the California Avenue Sewer at a depth <br />of 25 feet below grade. All three projects were to be completed together for the <br />final and finished sewer lift station to function. <br />Blandwood Road/True Avenue Sewer Lift Station Replacement <br />CITY OF DOWNEY I DOWNEY, CA <br />Construction Inspector. Mr. Farnaghi was responsible for site observation <br />and construction quality for the City during the replacement of two old <br />sewer lift stations on Blandwood Road and True Avenue with a new wet well <br />submersible type sewer lift station. The project included construction of new <br />V 5 sewer gravity and force main lines to deliver from and convey raw sewage to <br />the new station. The project also included the construction of AC pavement, <br />PCC sidewalks, driveways, and curb and gutter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.