Laserfiche WebLink
CONTACTINFO JAMES REMUS <br />james.remus@nv5.com Construction Inspector <br />949.585.0477 p <br />EXPERIENCE <br />Mr. Remus has spent more than 28 years as a construction inspector for <br />28 years <br />a variety of pipeline and construction projects. He has worked closely with <br />EDUCATION <br />engineering firms, public agencies and specialists in the fields of biology and <br />Office Management <br />archaeology as related to respective projects. Mr. Remus is knowledgeable in <br />a variety of construction activities, including heavy documentation of design/ <br />LICENSES/ <br />build structures, testing and trench safety. He has spent more than 13 years as <br />CERTIFICATES <br />a cross -connection specialist with the Walnut Valley Water District. <br />Cross Connection <br />Control and Backflow <br />Project Experience <br />Preventionand Program <br />.................................................................................................................................................................................... <br />Specialist <br />Staff Augmentation Inspection Services <br />C2 Workzone Traffic <br />IRVINE RANCH WATER DISTRICT I IRVINE, CA <br />Control Certificate <br />Inspector. Mr. Remus provided inspection services for water, wastewater <br />OSHA 10-Hour <br />and sewer projects for the Irvine Ranch Water District. His duties include: <br />Construction Certificate <br />confirming that the Contractors are adhering to the Contract Documents, as <br />well as generating daily reports for several ongoing projects. The types of <br />AVAILABILITY <br />projects he has worked on include: housing tracts, commercial sites, as well as <br />60% <br />capital and non -capital projects. <br />Odor Reduction Facility <br />ENCINA WASTEWATER AUTHORITY <br />Construction Inspector. Mr. Remus' duties included inspection services, <br />reviewing shop drawings, reviewing change orders, and request for information <br />and daily reports. <br />Sunnyslope Avenue Pipeline, Junkie Tank and Pump Station <br />ELSINORE VALLEY WATER DISTRICT I LAKE ELSINORE, CA <br />Construction Manager. The project included the installation of a new <br />pump station, discharge 8-inch potable pipeline through a hilltop residential <br />neighborhood that had limited access and a narrow road, and bolted steel <br />potable water storage tank. <br />San Luis Rey Wastewater Treatment Plant <br />CITY OF OCEANSIDE I OCEANSIDE, CA <br />Construction Manager. The project included the expansion and upgrading of <br />the existing San Luis Rey Wastewater Treatment Plant. <br />16-inch Potable and Non -Potable Pipeline <br />YUCAIPA VALLEY WATER DISTRICT I YUCAIPA, CA <br />Construction Inspector. The project included the installation of 16,000 LF of <br />16-inch potable and non -potable pipelines, including all appurtenances. <br />Recharge Pipeline Project <br />MOJAVE WATER AGENCY I MOJAVE, CA <br />Construction Inspector. Mr. Remus was responsible for a 15-mile segment of <br />the 48-inch CMI & C steel force main, which included both welded and o-ring <br />gasket joints. He was accountable for trench safety and proper placement of <br />N V 5 two -sack sand slurry mix in the pipe zone at specified locations. <br />