My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC - A-2020-076-01
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC - A-2020-076-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 4:24:04 PM
Creation date
5/6/2020 4:28:46 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-076-01
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACT INFO DANIEL WARREN <br />daniel.warren@nv5.com 949.585.0477 Construction Inspector <br />EXPERIENCE <br />Mr. Warren is a water/wastewater inspector with more than 26 years of <br />26 years <br />experience in public works. Additionally, Mr. Warren was a Grade III Water <br />LICENSES <br />Distribution Operator, and Grade II Water Treatment Operator for the Rowland <br />Water Distribution <br />Water District. He also served as a Construction Inspector for the City of La <br />Operator Grade III <br />Habra Heights. Mr. Warren is extremely knowledgeable about the need for the <br />No. 8020 <br />Contractor's conformance to the approved plans and specifications, adherence <br />to field quality control, as well as what the various heavy construction industry <br />Water Treatment <br />standards and construction principles are for water and wastewater systems. <br />Operator Grade II No. <br />Mr. Warren has a significant knowledge of all aspects of public utilities and <br />18940 <br />provides expert quality control for all aspects of potable water, sewer, and <br />Recycled Site Supervisor <br />recycled water works throughout his execution of his duties as an Inspector. <br />Conversion from Potable <br />to Recycled Water <br />Project Experience <br />CompetentPerson <br />......................................................................................................I............... <br />Site Survey for Soil <br />Bankfield Sewage Pump Station <br />Conditions <br />CITY OF CULVER CITY I CULVER CITY, CA <br />Inspector. Mr. Warren is providing inspection services for the construction <br />Trench Shoring Certified <br />of the Bankfield Sewage Pump Station. The new pump station will receive <br />Underground Utilities <br />diverted flows from two existing pump stations once construction is complete, <br />Certified <br />and possibly diverted flows from two more pump stations at a later date. The <br />AVAILABILITY <br />new pump station will have a 10-feet-by-20-feet sewage wet well that is 35 feet <br />50% <br />deep, constructed in groundwater with watertight shoring. There will be two <br />submersible pumps, a flow meter vault, a valve vault, a bypass vault for the <br />two force mains, and an emergency diesel -fueled backup electrical generator. <br />There also will be a 25-feet-by-20-feet building to house instrumentation and <br />SCADA systems, a bathroom and electrical components. <br />Arantine Hills Sewer and Water Infrastructure Projects <br />CITY OF CORONA I CORONA, CA <br />Inspector. Mr. Warren provided inspection services for the $14.7M three- <br />phase Arantine Hills sewer and water improvement projects to provide the <br />necessary infrastructure for the Arantine Hills Development Project. The <br />project involved the construction of a buried cast -in -place sewer lift station with <br />above -grade controls. This was connected to a second project to construct <br />the sewer force main with fused HDPE pipe via conventional open trench and <br />trenchless jack -and -bore sewer construction along arterial streets and Caltrans <br />ROW, forming 4 miles of pipeline. Relocation of 3,300 LF of potable water <br />line also was required to install the new force mains. A third project managed <br />simultaneously was the construction of the California Avenue Sewer at a depth <br />of 25 feet below grade. All three projects were to be completed together for the <br />final and finished sewer lift station to function. <br />Well Installation and Treatment <br />ROWLAND WATER DISTRICT I ROWLAND HEIGHTS, CA <br />V 5 Inspector. Mr. Warren provided inspection services for the installation of a <br />water well to treat contamination of the groundwater and return the water <br />source to the recycled water distribution system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.