Laserfiche WebLink
CONTACT INFO <br />SALVADOR SANCHEZ <br />sa Ivad or. san chez@ nv5. <br />Construction Inspector <br />com <br />949.585.0477 <br />................................................................................................................................................................................... <br />Mr. Sanchez is adept at managing and delivering a variety of public works <br />EXPERIENCE <br />projects, including water, sewer, and storm drain improvements. His skills in <br />30 years <br />the development of project control procedures and methodologies for cost <br />CERTIFICATIONS <br />and schedule control have been implemented on several large-scale projects. <br />CA Water Distribution <br />Mr. Sanchez has accrued more than 30 years of public works experience, <br />Operator, D5 No. 08546 <br />demonstrating his expertise in a range of responsibilities, including six years <br />with the City of Riverside, nine years with the City of Pico Rivera and 14 years <br />CA Water Treatment <br />with the City of Glendale Water Department. <br />Operator, T4 No. 16793 <br />Water utilities Sciences Project Experience <br />Certificate .................................................. <br />AVAILABILITY Water Main Replacement and Street Improvements <br />50% CITY OF MANHATTAN BEACH I MANHATTAN BEACH, CA <br />Inspector. Mr. Sanchez provided inspection services for the 2013-2014 Water <br />Main Replacement and Street Improvements project. The project replaced old <br />and/or undersized water mains to reduce the risk of main breaks and enhance <br />fire suppression flows. New 6-inch ductile iron pipes replaced a total of 10,261 <br />LF of existing water mains. Work also included the installation of five new fire <br />hydrants, reconnection of four existing fire hydrants and the installation of <br />2-inch water blowoff assemblies at four sewer pump stations. <br />Long Beach Water Department Emergency Project <br />LONG BEACH WATER DEPARTMENT I LONG BEACH, CA <br />Inspector. Mr. Sanchez provided inspection services for the completion of <br />an emergency project for the Long Beach Water Department. The project <br />provided LBWD a connection to the Los Angeles County Sanitation District's <br />(LACSD) reclaimed water pipeline. While initially being constructed by a <br />different contractor under the jurisdiction of LACSD, after construction was <br />underway, LACSD's Contractor abandoned the project and LBWD agreed <br />to take over the work. Work involved construction of additional 25-foot deep <br />shoring within 5 feet of the operational LACSD operational plant. <br />Various Water and Wastewater Projects <br />CITY OF GLENDALE DEPARTMENT OF WATER AND POWER I GLENDALE, CA <br />Inspector/Water System Supervisor II. Mr. Sanchez was responsible for the <br />management and inspection of several water and wastewater projects over the <br />course of 14 years. Responsibilities included inspecting construction, repair, <br />maintenance and operation of water systems and pumping facilities; supervising <br />pump maintenance mechanics, water distribution operators, water treatment <br />operators, SCADA technicians and water system apprentices; overseeing the <br />operation and maintenance of a Diatomaceous Earth Filter Treatment Plant: <br />preparing for water outages and coordination with City staff and contractors <br />for smooth and efficient outages; implementing necessary changes or <br />postponements of projects as the system dictated; working with water quality <br />staff and health departments on water system sanitary surveys; reviewing and <br />evaluating employee job performance and recommending appropriate personnel <br />V 5 action; and recording and reporting monthly to the water superintendent. <br />