My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC - A-2020-076-01
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC - A-2020-076-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 4:24:04 PM
Creation date
5/6/2020 4:28:46 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-076-01
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACTINFO CARLOS BARRIOS <br />carlos.barrios@nv5.com Construction Inspector <br />949.585.0477 p <br />EXPERIENCE <br />Mr. Barrios is a water/wastewater inspector with more than 30 years of <br />30 years <br />experience in public works. Additionally, Mr. Barrios was a Grade D5 Certified <br />LICENSES/ <br />Water Distribution Operator and Grade T3 Certified Water Treatment <br />CERTIFICATES <br />Operator for the City of Glendale Department of Water & Power. He has a <br />Certified Water <br />vast knowledge of governmental operations, policies, and procedures. His <br />Distribution Operator, <br />responsibilities include site observation and construction quality assurance <br />Grade D5 No. 10282 <br />and control, ensuring general site safety, preparing daily reports, photo <br />documentation, monitoring SWPPP and BMP implementation, providing daily <br />Certified Water Treatment <br />updates to the City project manager, and tracking quantities. <br />Operator, Grade T3 No. <br />21130 <br />Project Experience <br />AVAILABILITY................................................................................................................................................................................. <br />50% <br />Water Well No. 12 Packer Project <br />CITY OF SANTA FE SPRINGS I SANTA FE SPRINGS, CA <br />Construction Inspector. Mr. Barrios provided construction inspection <br />services for the removal of an existing pump, well rehabilitation, initial/final <br />video surveys, installation of a test pump, depth discrete water sampling <br />and laboratory analysis, installation of packer(s), pumping test(s) for packer, <br />removal of test pumps, and the re -installation of well the pump. <br />City of Glendale, Department of Water & Power <br />CITY OF GLENDALE <br />Project Manager/Construction Inspector. Mr. Barrios oversaw site <br />development construction activities at various stages of construction for <br />conformance with plans, specifications, city ordinances, safety regulations, and <br />material standards. He provided daily inspection reports, oversaw construction <br />methods and procedures including the Best Management Practices (BMP's), <br />maintained OSHA standards and the traffic "Watch Manual," and public <br />outreach services. Projects included: <br />• Inspection for the construction of the Pelanconi Avenue Water Main <br />Cleaning and Lining Project <br />• Inspection for the construction of the Central Avenue Water Main Cleaning <br />and Lining Project <br />• Inspection for the construction of the Public Work's Project "Fiscal Year <br />2008/09 Street Rehabilitation Project" which includes the construction of <br />storm drain pipes, catch basins, and manholes; Removal of an existing <br />18-inch corrugated metal pipe (CMP) and replacement with a 24-inch <br />reinforced concrete pipe (RCP); Removal and replacement of sewer pipes. <br />• Inspection for the construction of the Public Work's Project Flower Street <br />Widening Project, which includes the construction of storm drain pipes, <br />catch basins, and manholes; Removal and replacement of sewer pipes <br />and relocation of several well lines, recycled lines and potable mains. <br />• Inspection for the construction of the Public Work's Project "Grandview <br />Street Repair Project" which includes the construction of storm drain <br />pipes, catch basins, and manholes; Removal and replacement of sewer <br />V 5 pipes; and the relocation of several well lines, recycled lines and potable <br />mains. <br />
The URL can be used to link to this page
Your browser does not support the video tag.