My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS (2)-A-2020-075-03
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS (2)-A-2020-075-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 8:21:48 AM
Creation date
5/6/2020 4:32:18 PM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS
Contract #
A-2020-075-03
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
10/15/2024
Destruction Year
2024
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Michael Swan, PE, ENV SP I Psomas <br />Alternate Point of Contact I Project Manager — Water/Sewer Planning and Design <br />REGISTRATION <br />1975/CA/Professional <br />Engineer/Civil/25737 <br />EDUCATION <br />1970/BS/Civil Engineering/ <br />University of California, <br />Davis <br />CERTIFICATION <br />Envision Sustainability <br />Professional/Institute for <br />Sustainable Infrastructure <br />PROFESSIONAL <br />AFFILIATIONS <br />• Association of California <br />Water Agencies <br />• Orange County Water <br />Association <br />Mike Swan has over 40 years of experience in project engineering <br />and management of diverse public works and public finance projects <br />throughout Southern California. He has extensive experience in water <br />resources master planning and design, as well as the development and <br />implementation of financing for these and other public works projects. <br />Project Experience <br />Water Main Replacement, City of El Monte, CA: Project Manager for <br />provision of PS&E, surveying, environmental and permitting, community <br />outreach, and construction support services for the replacement of <br />approximately 6,900 LF of 4- and 6-inch water mains with larger mains <br />in two areas of the City's distribution system, due to their age, and to <br />improve fire flow and reliability. Psomas accomplished the scenario <br />modeling, prepared an economic analysis, compared flow and pressure <br />results, and prepared a technical memorandum documenting the <br />analyses and presenting recommendations. <br />On -Call Water System Modeling, City of El Monte, CA: Project <br />Manager for the update of the City's 2010 hydraulic model. Water <br />distribution system model files were obtained and updated into InfoWater <br />software. The model was updated based on system improvements, <br />recent demand data, and current well data and operation to accurately <br />depict existing conditions. The model has subsequently been used <br />in conjunction with proposed development projects and to determine <br />required system improvements to meet the City's water service criteria. <br />As a follow-up to this on -call work, Psomas was retained to design a <br />major water replacement project which Mr. Swan is managing. <br />Hidden Hills Booster Pump Station, Yorba Linda, CA: Project Manager <br />for engineering services for the design of an emergency storage basin <br />(ESB) for Santa Margarita Water District's Coto de Caza lift station. <br />Key design features include design of the cast -in -place concrete ESB; <br />submersible pump selection; coordination of an existing SDG&E power <br />supply line relocation; construction of a retaining wall and concrete <br />drainage swale between the ESB and access road, access improvements <br />to allow a tanker truck access to the ESB; and design of overflow pipeline, <br />drain pipeline and sluice gates. Scope of services includes preliminary <br />and final design, construction plans, specifications, estimates of probable <br />construction costs and engineering support during construction. <br />Sewer Rehabilitation, Rossmoor/Los Alamitos Area Sewer District, <br />Rossmoor and Los Alamitos, CA: Project Engineer for the design of <br />sewer segment rehabilitation in various locations in Rossmoor and the <br />City of Los Alamitos. Psomas staff reviewed 60,000 feet of sewer system <br />CCTV tapes and made appropriate recommendations for repairs where <br />needed. The rehabilitation design comprised a combination of CIPP lining <br />of approximately 2,830 feet of 8-inch through 18-inch-diameter sewer <br />in 11 separate locations; UV -Cured Point Repairs (trenchless) at 68 <br />.1nu an I- - _ . RFP No 19-100 PSOMAS <br />
The URL can be used to link to this page
Your browser does not support the video tag.