My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS (2)-A-2020-075-03
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS (2)-A-2020-075-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 8:21:48 AM
Creation date
5/6/2020 4:32:18 PM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS
Contract #
A-2020-075-03
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
10/15/2024
Destruction Year
2024
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jane Cataldo, RLA, ENV SP, LEED AP I Lynn Capouya, Inc. <br />Landscape Architecture <br />LYNN CAPOUYA INC. <br />LANDSCAPE ARC' -_FCTS <br />REGISTRATION <br />1984/Landscape Architect/ <br />CA #2512 <br />EDUCATION <br />1976/BS/Landscape <br />Architecture/Cornell <br />University, College of <br />Agriculture and Life <br />Sciences, Ithaca, NY <br />CERTIFICATIONS <br />2009/LEED Accredited <br />Professional/U.S. Green <br />Building Council <br />2016/Envision <br />Sustainability Professional/ <br />Institute for Sustainable <br />Infrastructure <br />Jane Cataldo has over 40 years of experience in water related projects <br />along with a variety of other project types, including streetscapes, parks, <br />plaza design both on -grade and on -structure, professional offices, <br />shopping centers, industrial complexes, schools and public institutions, <br />sports fields and turf renovation. She directs production staff and <br />operations, ensuring timely project delivery. Jane has extensive experience <br />working with the California environment and drought tolerant plant species. <br />She is LEED certified and applies her knowledge of sustainability practices <br />to achieve compliance with current water conservation legislation. <br />Project Experience <br />Westside Pump Station Rehabilitation (3-52), Orange County <br />Sanitation District, Los Alamitos, CA: Design Director responsible <br />for landscape architecture design and involved in rehabilitation of the <br />existing 8-MGD Westside Pump Station to an 18.8 MGD pump. The <br />landscape design incorporated community feedback and included <br />drought tolerant plants, a decorative wrought iron entry gate, and mature <br />palm trees to blend aesthetically with the residential community. <br />Peyton Drive Phase 3 and English Channel, Creek Habitat Mitigation, <br />City of Chino Hills, CA: Design Director for preparation of landscape <br />and irrigation plans for the mitigation and preservation of English Channel, <br />based on the HMMP prepared for the site. The scope of work involved <br />creation, mitigation and preservation of three types of habitats, including <br />wetland habitat, riparian terrace habitat, and riparian buffer areas. <br />Groundwater Replenishment Injection Well 32 Perimeter Planting, <br />Orange County Water District, Huntington Beach, CA: As Design <br />Director, worked with the Orange County Water District and City staff to <br />landscape and irrigate all exposed streetscape perimeters of this existing <br />pump station. The project was located between an existing residential <br />neighborhood and a convenience store. The facility required the <br />landscape scheme be the unifying element within the neighborhood. City <br />requirements dictated the use of screen walls and vegetation to screen <br />the recharge pumps from public view with shrubs and trees planted at the <br />base of the walls to soften the overall effect. <br />La Palma Complex Reservoir Rehabilitation and Pump Station, City <br />of Anaheim, CA: As Design Director for the landscape architecture <br />design, was involved in pump station rehabilitation that included <br />protection and preservation of existing trees, on -site runoff retention, <br />water efficient plant palette and an upgraded irrigation system with a <br />satellite -based controller and highly efficient nozzles. <br />Well 54 Site Planting, City of Anaheim, CA: Design Director working <br />with the Prime Consultant and City staff to landscape and irrigate <br />all exposed perimeters of the new pump station. Set in an existing, <br />established residential neighborhood, the facility required the landscape <br />scheme be integrated into the adjacent surroundings. The design for the <br />project was completed using a drought tolerant and native plant palette. <br />City DI Sanla Ana i , :e ;a' _ _;, er r ; 5 i , i;s I RFP No.19-100 P S 0 M A S <br />
The URL can be used to link to this page
Your browser does not support the video tag.