My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS (2)-A-2020-075-03
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS (2)-A-2020-075-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 8:21:48 AM
Creation date
5/6/2020 4:32:18 PM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS
Contract #
A-2020-075-03
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
10/15/2024
Destruction Year
2024
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Earl LaPensee, CHG I Richard Slade & Associates <br />Production Wells/Hydrology <br />RICHARD C.HOU DE 5 ASSOCIATES LL <br />RIOiARD GR.L lACE 1ER GEOLOGISTS <br />Earl LaPensee has been a Groundwater Geologist/Hydrogeologist <br />with the firm since 1989. Major projects while with the firm have <br />included the hydrogeologic assessment and analysis of groundwater <br />basins in Southern and Northern California and the exploration for and <br />development of groundwater in those basins. Mr. LaPensee's current <br />focus has been on projects involving the development of groundwater in <br />EDUCATION <br />Southern California groundwater basins encompassing the siting, design <br />and technical oversight of construction for municipal- and irrigation- <br />1983/BS/Geology/ <br />supply water wells. In addition, Mr. LaPensee has also provided technical <br />University of California, <br />oversight in the siting, design and testing of aquifer storage and recovery <br />Los Angeles <br />(ASR) wells and groundwater monitoring wells for hazardous waste sites. <br />1986/MS/Geological <br />project Experience <br />Sciences (Specialty: <br />Trace -Element <br />City of Santa Monica Well Construction, Rehabilitation and <br />Geochemistry)/University <br />of California <br />Destruction, Olympic Corridor Area, City of Santa Monica, CA: <br />Project Hydrogeologist for construction of two wells to a depth of <br />CERTIFICATIONS <br />600-feet, rehabilitation of an existing well, and the destruction of an older <br />well. Currently in the bidding phase. Principal responsibility is as the <br />Certified Hydrogeologistl <br />overall project manager on the project. <br />CA #134 <br />Certified Professional <br />Well No. 29, City of Santa Ana, CA: Project Hydrogeologist for <br />Geologist/CA# 4733) <br />in -progress hydrogeologic support to Psomas with regard to the <br />rehabilitation of City Well No. 29. Project involved the evaluation of <br />1986/California Community <br />downwell conditions, preparation of project technical specifications, <br />College Instructor <br />and field oversight activities during rehabilitation of the well. Principal <br />responsibility is as the overall project manager. <br />Well No. 28D, Alondra Boulevard, Liberty Utilities Company (formerly <br />Park Water Company), Lakewood, CA: Project Hydrogeologist for office <br />and field hydrogeologic services to Liberty Utilities Company for the <br />preliminary and final designs and construction of the well. The well <br />was constructed to a depth of 1,060 feet and achieved a pumping rate <br />of 2,500 GPM, with a specific capacity of 70 GPM/feet ddn. Principal <br />responsibility was as the overall project manager on the project. <br />Well No. 12C, Liberty Utilities Company, (formerly Park Water Company), <br />Compton, CA: Project Hydrogeologist for office and field hydrogeologic <br />services to Liberty Utilities Company for the preliminary and final designs <br />and construction of the well. The well was constructed to a depth of <br />1,060 feet and achieved a pumping rate of 2,500 GPM, with a specific <br />capacity of 70 GPM/feet ddn. Principal responsibility was as the overall <br />project manager on the project. <br />PSOMAS RFP Na 19 130 - _I I_a= i Cily of Sanla Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.