My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
65B - HOMLESS SHELTER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
65B - HOMLESS SHELTER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 2:24:56 PM
Creation date
6/15/2020 2:19:15 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
65B
Date
6/16/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03:11:311WaG1 <br />City of Santa Ana <br />RFP: Year -Round Homeless Shelter and Navigation Center <br />operator will be responsible for funding subcontractors associated with all <br />levels of service; <br />5) If CDBG funds are used for rehabilitation of Respondent site, it is expected <br />the operating pro forma will reflect a reduced cost of facility operations; and <br />6) At time of contract execution, the operator will provide a detailed and final <br />sources and uses statement by contractor estimates, architectural drawings <br />for City site development plan or individual site development plan. <br />F. Property Standards: <br />1) The property must substantially comply with federal CDBG property <br />standards on the project start date, if applicable. <br />G. Site Control: <br />1) At the time of application, the Respondent must have control of the proposed <br />site through fee title, an option to purchase, a land sales contract, leasehold <br />with development provisions, or any other enforceable instrument approved <br />by the City. Site control must be demonstrated through construction finance <br />closing. If this is not possible, the Respondent must demonstrate to the City's <br />satisfaction all discretionary land use approvals can be granted within 180 <br />days of the application receipt. <br />H. Site Preparedness and Permitting Plan: <br />1) Respondent must include a detailed plan outlining how the proposed site <br />will be prepared and permitted according to all applicable laws and <br />regulations. <br />Management and Operations Plan: Respondent must submit a draft Management <br />and Operations Plan which may be amended after award. <br />
The URL can be used to link to this page
Your browser does not support the video tag.