My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2020-09-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
09/15/2020
>
FULL PACKET_2020-09-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 9:04:01 AM
Creation date
9/14/2020 8:46:47 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/15/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
585
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Firm and Experience <br />AZTEC Engineering California, Inc. (AZTEC) is <br />a multi -discipline consulting firm with a staff of over <br />150 professional, technical and support personnel. <br />Founded in 1992, AZTEC has developed a <br />reputation as a provider of quality engineering <br />services. In 2006, AZTEC became a subsidiary of <br />the TYPSA Group which has a staff of more than <br />2,500 employees located in 50 offices world-wide. <br />One of AZTEC's core business disciplines is <br />providing proven Subsurface Utility Engineering <br />(SUE) services for public agencies, municipalities <br />and private clients. Over the past 19 years, <br />AZTEC has provided SUE services for <br />numerous clients throughout the California and <br />the greater southwest on a variety of projects <br />and look forward to providing our services to <br />the City. <br />Firm Organization <br />AZTEC has assembled an outstanding team <br />of professionals to perform the SUE services <br />for this contract (see Figure 1: AZTEC Team <br />Organization Chart). AZTEC's Project <br />Manager, George Enriquez, and key <br />personnel are committed to leading this <br />contract and developing effective and cost - <br />conscience solutions to each assigned task. <br />Capabilities of Organization <br />Through effective project management, <br />experienced staff and team dedication we <br />pride ourselves on meeting/ exceeding the <br />needs of our clients and their projects. <br />AZTEC has the personnel, resources and <br />financial capabilities to provide the City with <br />the full range of SUE services needed for <br />this contract. <br />and support staff who have proven their knowledge <br />and ability on hundreds of similar projects. Our <br />unsurpassed expertise in SUE, Professional Utility <br />Coordination and GIS mapping are the capabilities <br />that make AZTEC an ideal provider of the SUE <br />services the City requires. <br />Subconsultants <br />While AZTEC will perform the majority of the <br />contract and serve as the prime consultant, we <br />have chosen Michael Baker as a subconsultant <br />for surveying services. For more than 30 years, <br />Michael Baker has played a significant role in the <br />development of southern California's expansive <br />transportation network, including work directly for or <br />on behalf of Caltrans and other local jurisdictions. <br />Proximity of Company's Resources <br />AZTEC maintains a fleet of utility designating and <br />vacuum excavation trucks at our Irvine, CA office, <br />approximately 9 miles from the City of Santa Ana <br />offices and facilities. Our fleet of trucks have all the <br />required equipment to perform the SUE tasks that <br />will be assigned under this contract. <br />Figure 1: AZTEC Team Organization Chart <br />'Art Mehler <br />"Key Personnel (Resume included) <br />Q Michael Baker International <br />Carlos Tarazaga <br />Dave Goos, PE <br />AZTEC has a highly experienced team in l 'George Enriquez <br />place with the technical expertise essential <br />to this contract, having completed more <br />than 700 SUE tasks for over 100 separate <br />entities. AZTEC has designated and mapped Anselmo Pablo -Bello 'Steve Slocum, PLS Q <br />more than 230 miles of underground utility Allen Autagavaia 4 Survey Teams <br />lines and safely excavated more than 60,000 4 SUE Crews <br />potholes for utility locating. <br />Under our SUE Project Principal, Carlos 'IML'Robert Rappleyea <br />Tarazaga, AZTEC offers the City the William Morales Najati Burrow <br />industry's most experienced SUE technicians Russell Cameron <br />
The URL can be used to link to this page
Your browser does not support the video tag.