My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH 2019-85
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
10/20/2020
>
75A - PH 2019-85
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2020 4:52:21 PM
Creation date
10/15/2020 4:42:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
10/20/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ER No. 2019-85/DBA No. 2020-01/SPR No. 2020-01/SPR No. 2020-02/DDA <br />October 20, 2020 <br />Page 6 <br />The agreement is with the Los Angeles/Orange County Building and Construction Trades Council, <br />which represents about 140,000 workers in dozens of trade unions, many of them Santa Ana <br />residents. <br />Public Parking Availability During Construction <br />During construction of the 3'd and Broadway project, downtown parking will decrease by 440 <br />spaces. Table 3 demonstrates the availability of sufficient parking within City -owned parking <br />facilities to absorb the 440 parking spaces within our own current inventory. <br />Downtown Santa Ana's existing parking supply is more than sufficient to meet current demand. <br />However, there may be a decrease in parking revenue as a result of the reduction of 440 spaces <br />at the 3'd and Broadway Parking Structure. During construction, there exists convenient options <br />available for public parking. It is important to note that these numbers were calculated before the <br />COVID pandemic. The pre-COVID capacity of the existing parking facilities can accommodate the <br />demolition of 440 public parking spaces now located within the 3'd & Broadway Parking Structure. <br />Table 2: Total Spaces Downtown <br />Descriptions <br />Spaces <br />City -Owned <br />1,995 <br />Parking Metered <br />500 <br />Spaces <br />Non -City -Owned <br />1,407 <br />Total Today <br />3,902 <br />Removed During <br />(440) <br />Construction <br />Total During <br />3,462 <br />Construction <br />Added with project <br />211 <br />Total After Project <br />3,673 <br />75A-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.