Laserfiche WebLink
1.0 Introduction <br />Avion Project SEIR <br />Page 1-8 <br />Chapter 11.0 Mitigation Monitoring and Reporting Program. Documents all the mitigation <br />measures identified in the 1998 EIR and this SEIR that are required to be implemented as part of the <br />project. <br />Chapter 12.0 References Cited. Lists all of the reference materials cited in the SEIR. <br />Chapter 13.0 Individuals and Agencies Consulted. Identifies all of the individuals and agencies <br />contacted during preparation of the SEIR. <br />Chapter 14.0 Certification. Identifies all of the agencies, organizations, and individuals responsible <br />for the preparation of the SEIR. <br />Technical Appendices <br />Technical appendices, used as a basis for much of the environmental analysis in the SEIR, have been <br />summarized in the SEIR and are printed under separate cover as part of the SEIR. The technical <br />appendices are available for review at the City of San Diego Development Services Center, 1222 First <br />Avenue, Fifth Floor, San Diego, California 92101. <br />Incorporation by Reference <br />As permitted by CEQA Guidelines Section 15150, this SEIR incorporates by reference previously <br />certified 1998 EIR (No. 96-7902) subsequent addenda and approved plans, which provide supporting <br />documentation used in the analysis for the project. This SEIR also references several technical <br />studies and reports, including the City of San Diego General Plan and EIR (2008) and the Black <br />Mountain Ranch Subarea Plan (2009, as amended). Information from these documents has been <br />briefly summarized in this SEIR, and their relationship to this SEIR described. These documents are <br />included in Chapter 12.0, References Cited, and are hereby incorporated by reference. They are <br />available for review at the City of San Diego Development Services Center, 1222 First Avenue, Fifth <br />Floor, San Diego, California 92101. <br />1.5 SEIR Public Review Process <br />1.5.1 Draft SEIR <br />In accordance with Sections 15085 and 15087 (a) (1) of the CEQA Guidelines, upon completion of the <br />Draft SEIR a Notice of Completion is filed with the State Office of Planning and Research, and a <br />notice of availability of the Draft SEIR is issued in a newspaper of general circulation in the area. <br />The Draft SEIR is distributed for a 45-calender day review to the public, and interested and affected <br />agencies for the purpose of providing comments “on the sufficiency of the document in identifying <br />and analyzing the possible impacts on the environment and ways in which the significant effects of <br />the project might be avoided or mitigated” (Section 15204, CEQA Guidelines). The public review <br />period will be from November 15 through December 30, 2019.