My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
05-11-20
>
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 10:02:45 PM
Creation date
11/9/2020 10:00:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.0 Mitigation Monitoring and Reporting Program <br />Avion Project SEIR <br />Page 11-3 <br />Contact Information: <br />a) The PRIMARY POINT OF CONTACT is the RE at the Field Engineering Division – <br />858-627-3200 <br />b) For Clarification of ENVIRONMENTAL REQUIREMENTS, it is also required to call RE and <br />MMC at 858-627-3360 <br />2. MMRP COMPLIANCE: This Project, Project Tracking System (PTS) No. 598173 and/or <br />Environmental Document No. 598173, shall conform to the mitigation requirements <br />contained in the associated Environmental Document and implemented to the satisfaction <br />of the DSD’s Environmental Designee (MMC) and the City Engineer (RE). The requirements <br />may not be reduced or changed but may be annotated (i.e. to explain when and how <br />compliance is being met and location of verifying proof, etc.). Additional clarifying <br />information may also be added to other relevant plan sheets and/or specifications as <br />appropriate (i.e., specific locations, times of monitoring, methodology, etc.). <br />NOTE: Permit Holder’s Representatives must alert RE and MMC if there are any <br />discrepancies in the plans or notes, or any changes due to field conditions. All <br />conflicts must be approved by RE and MMC BEFORE the work is performed. <br />3. OTHER AGENCY REQUIREMENTS: Evidence of compliance with all other agency <br />requirements or permits shall be submitted to the RE and MMC for review and acceptance <br />prior to the beginning of work or within one week of the Permit Holder obtaining <br />documentation of those permits or requirements. Evidence shall include copies of permits, <br />letters of resolution or other documentation issued by the responsible agency. <br />• California Department of Fish and Wildlife: California Fish and Game Code Section <br />1602 Streambed Alteration Agreement <br />• Federal Emergency Management Agency: Conditional Letter of Map Revision <br />• Regional Water Quality Control Board: National Pollutant Discharge Elimination <br />System General Construction Permit, Clean Water Act Section 401 <br />waiver/certification <br />• U.S. Army Corps of Engineers: Clean Water Act Section 404 authorization <br />• San Diego County Airport Land Use Commission Consistency Determination <br />(Conditional Consistency November 6, 2018) <br />4. MONITORING EXHIBITS: All consultants are required to submit, to RE and MMC, a <br />monitoring exhibit on a 11x17 reduction of the appropriate construction plan, such as site <br />plan, grading, landscape, etc., marked to clearly show the specific areas including the LIMIT <br />OF WORK, scope of that discipline’s work, and notes indicating when in the construction <br />schedule that work will be performed. When necessary for clarification, a detailed <br />methodology of how the work will be performed shall be included.
The URL can be used to link to this page
Your browser does not support the video tag.