My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20C - AA FOR METER INFRASTRUCTURE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
20C - AA FOR METER INFRASTRUCTURE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:46:26 PM
Creation date
11/12/2020 3:17:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20C
Date
11/17/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 24 of 52 <br />(h) The non -Federal entity must award contracts only to responsible contractors possessing <br />the ability to perform successfully under the terms and conditions of a proposed <br />procurement. Consideration will be given to such matters as contractor integrity, <br />compliance with public policy, record of past performance, and financial and technical <br />resources. See also 200.212 Suspension and debarment. <br />(i) The non -Federal entity must maintain records sufficient to detail the history of <br />procurement. These records will include, but are not necessarily limited to the following: <br />rationale for the method of procurement, selection of contract type, contractor selection <br />or rejection, and the basis for the contract price. <br />6) <br />(1) The non -Federal entity may use a time and materials type contract only after a <br />determination that no other contract is suitable and if the contract includes a ceiling <br />price that the contractor exceeds at its own risk. Time and materials type contract <br />means a contract whose cost to a non -Federal entity is the sum of: <br />(i) The actual cost of materials; and <br />(ii) Direct labor hours charged at fixed hourly rates that reflect wages, general and <br />administrative expenses, and profit. <br />(2) Since this formula generates an open-ended contract price, a time -and -materials <br />contract provides no positive profit incentive to the contractor for cost control or <br />labor efficiency. Therefore, each contract must set a ceiling price that the contractor <br />exceeds at its own risk. Further, the non -Federal entity awarding such a contract must <br />assert a high degree of oversight in order to obtain reasonable assurance that the <br />contractor is using efficient methods and effective cost controls. <br />(k) The non -Federal entity alone must be responsible, in accordance with good administrative <br />practice and sound business judgment, for the settlement of all contractual and <br />administrative issues arising out of procurements. These issues include, but are not <br />limited to, source evaluation, protests, disputes, and claims. These standards do not <br />relieve the non -Federal entity of any contractual responsibilities under its contracts. The <br />Federal awarding agency will not substitute its judgment for that of the non -Federal <br />entity unless the matter is primarily a Federal concern. Violations of law will be referred <br />to the local, state, or Federal authority having proper jurisdiction. <br />Agreement No. R20AP00075 Agreement Template <br />2 U C -26 (03/2019) <br />
The URL can be used to link to this page
Your browser does not support the video tag.