Laserfiche WebLink
Refine installation requirements, expectations, and timelines for each phase. <br />ii. Develop community outreach pre -installation and post -installation door hangers. <br />F. Training Plan <br />G. Testing Plan and User Acceptance/System Acceptance <br />8. Alpha POC Phase <br />8.1. Network Deployment <br />A. Network Basestations <br />Aqua -Metric will furnish Sensus M400 Basestations (`Basestation"), Basestation <br />antenna, and cellular backhaul modems, as defined in Appendix A and install one (1) <br />each at the East Station Tank, South Station Tank, West Station Tank, and City Hall <br />locations as detailed in the Sensus Propagation Analysis. Santa Ana will provide access <br />to each location and affirm each location is secure and suitable Basestation hardware. <br />a) West Station Tank Includes: <br />Saw cut, demo, remove and dispose of asphalt for footing, power conduit trench, <br />and bollards; construct new footing and erect 80 ft. Heavy Duty Magnum tower; <br />install new OMNI antenna and coax; install Basestation on footing; install ground <br />ring for tower and equipment; trench, install 2 PVC conduits, and backfill approx. <br />45 ft.; install new 120v circuit from panel to base station with disconnect; sweep <br />test; remove existing unused cantilever pole with crane; install 4 bollards and <br />paint with high visibility yellow paint; and install sheet metal barrier for the first <br />10 ft. <br />b) South Station Tank Includes: <br />Saw cut, demo, remove and dispose of asphalt for footing, power conduit trench, <br />and bollards; construct new footing and erect 80 ft. Heavy Duty Magnum tower; <br />install new OMNI antenna and coax; install Basestation on footing; install ground <br />ring for tower and equipment; trench, install 2 PVC conduits, and backfill approx. <br />10 ft.; install new 120v circuit from panel to base station with disconnect; sweep <br />test; install 6 bollards and paint with high visibility yellow paint; and install sheet <br />metal barrier for the first 10 ft. <br />c) East Station Tank Includes: <br />• Construct new footing and erect 80 ft. Heavy Duty Magnum tower; install new <br />OMNI antenna and coax; install Basestation on footing; install ground ring for <br />tower and equipment; trench, install 2 PVC conduits, and backfill approx. 10 ft. <br />from existing pull box to footing; install new 120v circuit from panel to base <br />station with disconnect through existing conduits approx. 165 ft.; sweep test; and <br />install sheet metal barrier for the first 10 ft. <br />d) City Hall Includes: <br />Install new Z brackets and 2"pipe antenna mast; install new Omni antenna and <br />coax; install Basestation on exterior wall under antenna mast; ground Basestation <br />to building steel; install new rigid conduit for power from supplied j-box next to <br />2 5 H -2 1 Page 14 <br />