Laserfiche WebLink
feasibility of implementing this measure. As such, <br />we are unable to verify that it will actually be <br />implemented, monitored, and enforced on the <br />Project site. As such, the proposed Project is not <br />consistent with this measure and the Addendum <br />lacks substantial evidence to support its <br />consistency determination. <br />Divert and recycle construction and demolition <br />Here, while the Addendum briefly discusses <br />waste, and use locally -sourced building materials <br />Mitigation Measure 4.13-6 which incorporates the <br />with a high recycled material content to the <br />"reuse and recycling of construction and <br />greatest extent feasible <br />demolition waste," the Addendum and associated <br />documents fail to demonstrate that the Project will <br />implement, monitor, and enforce this measure on <br />the Project site (p. 3.5-1). Furthermore, the <br />Addendum also fails to mention or discuss the <br />feasibility of using locally -sourced building <br />materials with a high recycled material content, as <br />the measure indicates. As such, the proposed <br />Project is not consistent with this measure and the <br />Addendum lacks substantial evidence to support its <br />consistency determination. <br />Minimize tree removal, and mitigate indirect GHG <br />Here, the Addendum and associated documents <br />emissions increases that occur due to vegetation <br />fail to mention or minimize tree removal <br />removal, loss of sequestration, and soil disturbance <br />whatsoever. Furthermore, the Addendum and <br />associated documents fail to mitigate the indirect <br />GHG emissions increases that occur due to <br />vegetation removal, loss of sequestration, and soil <br />disturbance, as the measure discusses. As such, the <br />proposed Project is not consistent with this <br />measure and the Addendum lacks substantial <br />evidence to support its consistency determination. <br />Increase use of electric and renewable fuel <br />Here, while the Addendum mentions using electric <br />powered construction equipment and require <br />construction equipment, the Addendum fails to <br />renewable diesel fuel where commercially <br />mention or require renewable diesel fuel where <br />available <br />commercially available, as the measure states (p. <br />3.4-2). As such, the proposed Project is not <br />consistent with this measure and the Addendum <br />lacks substantial evidence to support its <br />consistency determination. <br />Require diesel equipment fleets to be lower <br />Here, the Addendum fails to evaluate the feasibility <br />emitting than any current emission standard <br />of or require diesel equipment fleets to be lower <br />emitting, as the measure discusses. As such, the <br />proposed Project is not consistent with this <br />measure and the Addendum lacks substantial <br />evidence to support its consistency determination. <br />Measures —operation <br />25 <br />75C-100 <br />