My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BLACK O'DOWD AND ASSOCIATES, INC. DBA BOA ARCHITECTURE
Clerk
>
Contracts / Agreements
>
B
>
BLACK O'DOWD AND ASSOCIATES, INC. DBA BOA ARCHITECTURE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 12:47:17 PM
Creation date
12/4/2020 3:54:44 PM
Metadata
Fields
Template:
Contracts
Company Name
BLACK O'DOWD AND ASSOCIATES, INC. DBA BOA ARCHITECTURE
Contract #
A-2020-230-06
Agency
Public Works
Council Approval Date
11/17/2020
Expiration Date
11/16/2023
Insurance Exp Date
1/1/1900
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana BOA <br />RFP for Space Planning and Architectural Consulting Services \ <br />RFP No.: 20-040 ���\ <br />Continuity: The understanding of the project needs and the resultant design goals must be maintained <br />throughout the project's duration. In construction phases, it is as necessary as in the design phases, to make <br />certain that the original intent, of the client and designer are realized in the final built product. This will be <br />very important in the construction phasing of your project. The key members of the team, under the <br />leadership of the Project Manager will be responsible for the direction of the project throughout all phases to <br />ensure continuity of design intent. <br />2. PROJECT DOCUMENTATION <br />Project Documentation is a result of systems set up in BOA's Project Management Manual. This guide on <br />how to run a project effectively and efficiently, developed more than 50 years of architectural practice, is firm, <br />but flexible; responsive to the specific dynamics of specific projects, but unyielding in its insistence on full <br />documentation, responsiveness, and performance. Keys elements include: <br />Project Checklist: This is initiated at the beginning of each project and services as a guide of all <br />elements of the project to be completed, and as a central index for all project related material. It is continually <br />updated and reviewed during regular project audits. <br />Product File and Technical Project Checklist: Initiated at the commencement of design, this <br />checklist serves to record all considerations and decisions regarding building materials and methods to be <br />used in construction. It also becomes a comprehensive guide for preparation of the Construction Documents. <br />3. CONSULTANT COORDINATION <br />Our engineering consultants play a very critical and active role in all phases of the work. The Project <br />Manager leads in coordinating the efforts of consultants with the help of: <br />• Frequent coordination meetings. <br />• Consultant orientation packets which are distributed at project commencement and periodically through the <br />project. <br />• Clearly defined scopes of work which define separation of responsibilities and eliminate grey areas. <br />• Milestone Outline, prepared specifically for each project which clearly defines consultant performance <br />expectations for each phase. <br />• Project Schedule coordinated with a milestone outline, reviewed and signed off by all consultants. <br />• Drawing Status Log which is updated every two weeks which track's consultant's performance. <br />• CADD [AutoCAD 2018 or Revit 3D 2018 (BIM)] procedures involving background and overlay methodologies <br />that insure up-to-date and coordinated design effort. <br />4. CONSTRUCTION ADMINISTRATION <br />BOA understands the importance of efficient construction administration. To ensure that the design and <br />technical intent are conveyed to the contractor and that the project knowledge is available throughout this <br />phase, the construction administration is led by the project manager. The Project Manager and Designer, <br />Edward Lok Ng will personally review shop drawings as well as attend all job site meetings to quickly resolve <br />design and construction detailing issues. A Senior Project Manager from each of our engineering consultants <br />will be assigned to assist the Project Manager and ensure that the highest standard, procedures and methods <br />of construction are employed. BOA has a Construction Administration Manual to assist the Project Manager <br />with an established system to track shop drawings, RFI, change orders, and documentation of construction <br />site meetings, so that keys decisions are tracked and managed for the benefit of the Client. If there will be <br />on -going operations and services, BOA will assist in the development of a Construction Phasing Plan to <br />ensure that on -going operations and services will have minimum disruptions. BOA is well aware of the need <br />for Public Agency services to remain operational during construction. We have had good results recently <br />assisting the Cities of Long Beach, Torrance, Irvine, and San Bernardino County on renovation and addition <br />projects that require facilities to remain open during construction. <br />5. QUALITY CONTROL <br />Quality assurance begins with the commitment, experience and abilities of the team members. All of the <br />firm's personnel contain many design specialists versed in the complexities of the individual phases of the <br />25G-276 <br />UNDERSTANDING THE NEED <br />
The URL can be used to link to this page
Your browser does not support the video tag.