Laserfiche WebLink
DocuSign Envelope ID: 1BA90275-0048-437F-ACEC-13F73597F313 <br />WARE NIALCON B <br />ARCHITECTURE PLANNING <br />INTERIORS CIVIL ENGINEERING <br />BRANDING BUILDING MEASUREMENT <br />5. [OPTIONAL] Ware Malcomb has included [# of views in words] (#of views) Revit / Enscape rendering <br />views per below, with one (1) minor revision per view included (less than 10% change each). To be <br />determined based on specific project scope. <br />6. Ware Malcomb shall attend up to [# of meetings in words] (#of meetings) one -hour meetings for <br />design and review. To be determined based on specific projectscope. <br />7. It is anticipated that this phase will be [# of weeks in words] (#of weeks) weeks. To be determined <br />based on specific project scope. <br />E. Design Development Phase: <br />1. Based on the approved Schematic Design, Ware Malcomb shall provide final Design Development to <br />include plans with fixed dimension, elevations, relevant details, electrical and lighting solutions to <br />provide City of Santa Ana a representation of the final design. <br />2. Present final finish palette that shows all materials, finishes and colors. One (1) minor revision (a <br />maximum of 10%) is included. <br />3. [OPTIONAL] Rendered Views that were previously provided will be updated, based on the approved <br />Design Development package, with one (1) minor revision per view included (less than 10% change <br />each). To be determined based on specific project scope. <br />4. Provide plans and other design information to Consultants as directed by City of Santa Ana. <br />5. Provide progress prints of plans and other design information for preliminary pricing by a General <br />Contractor and for review by City of Santa Ana. <br />6. Assist City of Santa Ana in evaluating preliminary pricing and other project information. <br />7. Ware Malcomb shall attend up to [# of meetings in words] (#of meetings) one -hour meetings for <br />design and review. To be determined based on specific projectscope. <br />8. It is anticipated that this phase will be [# of weeks in words] (#of weeks) weeks. To be determined <br />based on specific project scope. <br />F. Contract Documents Phase: <br />Prepare Contract Documents based on the approved Design Development documents or as authorized by City <br />of Santa Ana. The documents shall set forth in detail the requirements for construction of the project. The <br />scope of work shall include the following: <br />1. Prepare Interior Architectural Contract Documents of the project. A Project Manual is not included, but <br />may be added for an Additional Service. <br />10 Edelman, Irvine, CA 92618 P 949.660.9128 "'28 <br />1 489 <br />4.20.2020 PAGE 4 of 10 <br />