My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IDS GROUP (2)
Clerk
>
Contracts / Agreements
>
I
>
IDS GROUP (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 3:59:02 PM
Creation date
5/6/2021 4:25:49 PM
Metadata
Fields
Template:
Contracts
Company Name
IDS GROUP
Contract #
A-2021-058
Agency
Public Works
Council Approval Date
4/20/2021
Expiration Date
4/20/2024
Insurance Exp Date
11/12/2021
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant Responsibilities: <br />The Consultant's responsibilities include the following: <br />Task I: Preliminary Engineering <br />Preliminary Engineering shall include Kick-off meeting with City Staff to discuss scope of work, <br />project required tasks and objectives, potential elements and issues, and schedule. Preliminary <br />Engineering will also include field work and subsequent meetings with City staff as required for <br />preparation of site plans. <br />Project required tasks include, but may not be limited to: <br />• Identify the locations where all of the above ground equipment and light standards will be <br />installed. <br />• Identify where all the underground utilities are located to eliminate field conflicts. <br />• Coordinate with Southern California Edison from application filing through construction and <br />until the lights are lit. <br />Task 2: Design Development (30%plans) <br />Design development will involve the development of electrical system improvements for security <br />lighting as outlined in the preliminary engineering phase to address project required tasks and shall <br />include preliminary electrical engineering plans and cost estimate. Should project scope exceed <br />available budget, project plans/specifications will be value engineered or phased as appropriate. <br />Electrical design tasks shall include, but may not be limited to: <br />• Title Sheet (City provide template) <br />• Electrical & Lighting plans <br />• Photometric <br />• Load and Diagram schedule <br />• Details and notes <br />Task 3: Construction Documents (85% and 100% plans) <br />Construction Documents shall include finalizing Design Development plans, obtaining plan check <br />approvals and securing permitting. This includes the provision of detailed engineering and <br />construction drawings that will serve as the basis for both bid advertisement and construction. <br />Consultant shall also provide updated cost estimate which shall reflect finalized plans, materials, <br />systems, details of construction, and known or anticipated changes in the bidding market relative to <br />the project. <br />Project required tasks shall include, but may not be limited to: <br />• Plans and Specifications (Contract Documents) shall be reviewed at 85% and 100%. <br />• Updated Cost Estimate shall be provided. Project phasing may need to be considered and <br />Contract Documents may need to be structured accordingly pending available construction <br />funding. <br />• Review sets shall be provided in .pdf format. <br />• Final plans shall be provided in Micro Station V8i format and .pdf format. <br />City of Santa Ana RFP 20-129 <br />Page Al-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.