My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IDS GROUP (2)
Clerk
>
Contracts / Agreements
>
I
>
IDS GROUP (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 3:59:02 PM
Creation date
5/6/2021 4:25:49 PM
Metadata
Fields
Template:
Contracts
Company Name
IDS GROUP
Contract #
A-2021-058
Agency
Public Works
Council Approval Date
4/20/2021
Expiration Date
4/20/2024
Insurance Exp Date
11/12/2021
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Electric Bike Trail — Phase 2. Sand Pointe Park <br />RFP No.20-129 <br />Section 2: Scope of Services and Schedule <br />Our mission at IDS is to deliver a quality project to our clients. To achieve this goal, a carefully thought out plan, in <br />which both client and IDS agree on the project scope and an approach that will result in a successful project. <br />The project scope involves the preparation of Construction Documents suitable for bidding and plan check approval to <br />include new electrical and area lighting systems for Pacific Electric Bike Trail and Sandpointe Park. <br />The following is a step-by-step approach that was outlined in the City of Santa Ana's RFP and that IDS has <br />implemented on many successful projects as well: <br />Task 1: Preliminary Engineering: <br />Preliminary Engineering shall include one Kick-off meeting with City Staff to discuss scope of work, project required <br />tasks and objectives, potential elements and issues, and schedule. Preliminary Engineering will also include field work <br />and subsequent meetings with City staff as required for preparation of site plans. <br />Engineering and Design tasks include, but may not be limited to: <br />• Identify the locations where all of the above ground equipment and light standards will be installed. City shall <br />provide topography maps; <br />• Identify all the underground utilities are located to eliminate field conflicts. IDS will utilize our in-house Civil <br />Engineering, and <br />IDS will coordinate with Southern California Edison (SCE) from application filing through construction and until the <br />installation is complete and system is energized from SCE. Our proposal assumes electrical service upgrade is <br />required for both projects. <br />Task 2: Design Development (30% plans) <br />Design development will involve the development of electrical system improvements for security lighting as outlined in <br />the preliminary engineering phase to address project required tasks and shall include preliminary electrical engineering <br />plans and cost estimate. Should project scope exceed available budget, project plans/specifications will be value <br />engineered or phased as appropriate. <br />Engineering and design required tasks shall include, but may not be limited to: <br />• Title Sheet (City provide template) <br />• Electrical & Lighting plans <br />• Photometrics <br />• Panel schedules <br />• Single line diagrams <br />• Details and notes <br />• Structural Calculations and details for lighting pole base foundations as required <br />• Preliminary Cost Estimation <br />IDS GROUP <br />Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.