My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLEINFELDER INC.
Clerk
>
Contracts / Agreements
>
K
>
KLEINFELDER INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:53:59 AM
Creation date
7/16/2021 11:49:26 AM
Metadata
Fields
Template:
Contracts
Company Name
KLEINFELDER INC.
Contract #
A-2021-121-02
Agency
Public Works
Council Approval Date
7/6/2021
Expiration Date
7/5/2024
Insurance Exp Date
1/1/1900
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kleinfelder Statement of Qualifications for On -Call Material Testing and Special Inspection Services <br />for City of Santa Ana, RFP No. 20-111 <br />Greg Johnson, PG, CEG, <br />Laboratory Supervisor <br />626.458.7986 <br />gjohnson@dpw.lacounty.gov <br />Relevance to this Contract: <br />• Field investigations <br />• Construction monitoring <br />• Laboratory testing <br />• Evaluation <br />• Recommendations <br />• Materials testing & inspection <br />• Independent assurance testing <br />Key Staff <br />• Dany Hanna, PE, MS, MBA <br />• Mike Dorsch <br />• Bryan Reese, ASP <br />• Roger Khoudessian, PE <br />• Rick Bell <br />• Dominic Montemayor <br />• Eric Kennedy <br />• Kim Byrd <br />• Jason Eckerson <br />• Robert Carman <br />• Mike Carman <br />• Jeffrey Diaz <br />• Cameron Massa <br />• Julian Calderon <br />• Michael Magana <br />• Vartan Deirdeirian <br />went: t anrans, uistnct t3 <br />Fee: $3.3 Million <br />Duration: 2017 - Ongoing <br />Reference: <br />Godson Anyanwu, PE, Chief <br />Caltrans Southern Regional Lab <br />(SRL) <br />951.232.3834 <br />Godson _Anyanwu@dot. ca.gov <br />Relevance to this Contract: <br />• Construction materials <br />observation <br />• Materials testing per CTMs <br />and Caltrans Construction <br />Manual <br />• Concrete and HMA batch <br />plant inspection <br />Under the management of Mr. Dany Hanna, PE, MS, MBA, <br />Kleinfelder has been consistently providing quality and effective on -call <br />materials testing services to the County. Projects include AC <br />pavement grind and overlay, reconstruction of concrete curbs and <br />gutters, sidewalks, median islands, curb ramps, driveway approaches, <br />alley intersections, and other appurtenant work. Under the current <br />contract, we have performed work on over 50 task orders. Kleinfelder <br />services are performed in accordance with the County's Quality <br />Assurance Plan (QAP) and Caltrans specifications. <br />Martin Luther King, Jr. (MLK) Medical Center Campus East <br />Parrking Structure. Kleinfelder's Team included several County <br />certified special inspectors with past experience on post -tensioned <br />parking structures in accordance with County and relevant <br />requirements/specifications. Kleinfelder also provided an Inspection <br />Coordinator to fulfill and document the contractor's inspection <br />requests. We additionally provided multi -certified special inspectors <br />as -needed to observe placement of reinforcing steel, post -tensioned <br />tendons, concrete, masonry block, masonry grout, anchor bolts, epoxy <br />dowels, and structural steel welding for this multi -story building. <br />Arcadia Mental Health Center Replacement. Kleinfelder provided <br />construction materials testing and special inspection services on <br />behalf of the County to assess conformance with the project <br />structural plans and specifications during construction. Our multi - <br />certified, in-house technicians and inspectors provided staffing <br />consistency and scheduling on this project, maintaning costs and <br />maximizing efficiencies. <br />CLIENT BENEFITS <br />Rapid local response of nearly two dozen local, certified materials <br />testers and inspectors through our centralized dispatching system - <br />minimizing costs associated with travel by utilizing staff who reside <br />near the project sites. <br />Under the management of Mr. Dany Hanna, PE, MS, MBA, <br />Kleinfelder is currently providing construction materials sampling and <br />testing and batch plant (asphalt concrete/PCC) inspection services to <br />improve the State transportation system throughout Caltrans District <br />8. Our services are performed by materials engineering testers <br />holding the appropriate Caltrans, ACI and AASHTO certifications at <br />numerous project sites and material supplier batch plants. <br />Task Order Manager Mr. Mike Dorsch performs project scheduling and <br />field coordination, review and distribution of daily field reports, materials <br />documentation and information, and prepares reports to Caltrans <br />standards and requirements. Our materials testers work together under <br />our Lead Materials Tester Mr. Roger Khoudessian, PE. <br />CLIENT BENEFITS <br />Kleinfelder's multi certified Consultant Materials Testers have <br />provided added value by being able to service multiple projects <br />KLE/NFELOER <br />N10v""-y�°�"F Kleinfelder1 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.